enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Glossary of construction cost estimating - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_construction...

    City cost index - see: Location cost index. RSMeans publishes a city cost index table. [3] Construction is a process that consists of the creation, modification, or demolition of facilities, buildings, civil and monumental works, and infrastructure. Construction cost - the total cost to construct a project. This value usually does not include ...

  3. Engineering drawing abbreviations and symbols - Wikipedia

    en.wikipedia.org/wiki/Engineering_drawing...

    An abbreviation used in parts lists (PLs, LMs, BoMs) in the quantity-per-assembly field when a discrete count is not applicable. For example, in an assembly with a bolted joint using four bolts, the PL quantity column will say "4" for the bolt PN, "4" for the nut PN, and "AR" for the liquid threadlocker that will be applied.

  4. Cut and fill - Wikipedia

    en.wikipedia.org/wiki/Cut_and_fill

    A mass haul diagram where land and rock cuts are hauled to fills Fill construction in 1909 Cut & Fill Software showing cut areas highlighted in red and fill areas shaded in blue. In earthmoving , cut and fill is the process of constructing a railway , road or canal whereby the amount of material from cuts roughly matches the amount of fill ...

  5. Suction excavator - Wikipedia

    en.wikipedia.org/wiki/Suction_excavator

    Typically, vacuum excavation loosens the soil with a blunt-nosed high-pressure air lance or water source and vacuums away loosened material. A suction excavator with vacuum excavation equipment operating in the Netherlands. Depending on the machine used and soil conditions, a 12-inch-square, 5-foot-deep pothole can be completed in 20 minutes or ...

  6. Tunnel construction - Wikipedia

    en.wikipedia.org/wiki/Tunnel_construction

    Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.

  7. Construction Specifications Institute - Wikipedia

    en.wikipedia.org/wiki/Construction...

    The Construction Specifications Institute (CSI) is a United States national association of more than 6,000 construction industry professionals who are experts in building construction and the materials used therein. The institute is dedicated to improving the communication of construction information through a diversified membership base of ...

  8. Glossary of civil engineering - Wikipedia

    en.wikipedia.org/wiki/Glossary_of_civil_engineering

    The SI unit for acceleration is metre per second squared (m s −2). Accelerations are vector quantities (they have magnitude and direction) and add according to the parallelogram law. [14] [15] As a vector, the calculated net force is equal to the product of the object's mass (a scalar quantity) and its acceleration. acid

  9. Unified Code for Units of Measure - Wikipedia

    en.wikipedia.org/wiki/Unified_Code_for_Units_of...

    millijoule per square metre second: mJ/(m 2 ⋅s) energy flux density: g⋅s −3: reciprocal millipascal: mPa −1: compressibility: m⋅g −1 ⋅s 2: millijoule per square metre: mJ/m 2: radiant exposure: g⋅s −2: gram square metre per steradian: g⋅m 2 /sr moment of inertia: m 2 ⋅g⋅rad −2: millijoule second per radian per gram: mN ...