enow.com Web Search

  1. Ads

    related to: overhead crane conductor rails chart images

Search results

  1. Results from the WOW.Com Content Network
  2. Overhead line - Wikipedia

    en.wikipedia.org/wiki/Overhead_line

    Operation of the overhead conductor rails at Shaw's Cove Railroad Bridge in Connecticut. In a movable bridge that uses a rigid overhead rail, there is a need to transition from the catenary wire system into an overhead conductor rail at the bridge portal (the last traction current pylon before the movable bridge).

  3. List of railway electrification systems - Wikipedia

    en.wikipedia.org/wiki/List_of_railway...

    Conductors: overhead line or; conductor rail, usually a third rail to one side of the running rails. Conductor rail can be: top contact: oldest, least safe, most affected by ice, snow, rain and leaves. Protection boards are installed on most top contact systems, which increases safety and reduces these affections.

  4. Third rail - Wikipedia

    en.wikipedia.org/wiki/Third_rail

    On most systems, the conductor rail is placed on the sleeper ends outside the running rails, but in some systems a central conductor rail is used. The conductor rail is supported on ceramic insulators (known as "pots"), at top contact or insulated brackets, at bottom contact, typically at intervals of around 10 feet (3.0 m). [clarification needed]

  5. Overhead power line - Wikipedia

    en.wikipedia.org/wiki/Overhead_power_line

    Overhead lines or overhead wires are used to transmit electrical energy to trams, trolleybuses or trains. Overhead line is designed on the principle of one or more overhead wires situated over rail tracks. Feeder stations at regular intervals along the overhead line supply power from the high-voltage grid.

  6. Current collector - Wikipedia

    en.wikipedia.org/wiki/Current_collector

    Electric overhead cranes and gantry cranes may use a current collector system to provide power over the full length of their operating area. The current collector assembly use sliding shoes that run on rails. Depending on the size of crane, contact rails may be copper wires, copper bars, or steel channels. mounted on insulating supports.

  7. Railway electrification in Great Britain - Wikipedia

    en.wikipedia.org/wiki/Railway_electrification_in...

    Acton Central station is a changeover point from 750 V DC third rail, to 25 kV AC overhead electrification, on the North London Line. Railway electrification in Great Britain began in the late 19th century. A range of voltages has been used, employing both overhead lines and conductor rails.

  8. List of rail transport systems using third rail - Wikipedia

    en.wikipedia.org/wiki/List_of_rail_transport...

    All South Korean systems use overhead wires (or rigid conductors), as do most modern mainland Chinese metros. In Europe all significant Spanish systems now have overhead power supply. Modern Latin America urban rail also uses overhead wires, though with some important exceptions. Special group of bottom power supplied railways are rubber-tyred ...

  9. Overhead line crossing - Wikipedia

    en.wikipedia.org/wiki/Overhead_line_crossing

    Frequently at the range of the crossing section, special precautionary measures are taken. Thus, at overhead line crossings at which the overhead line runs above the rope of the aerial tramway, two catch ropes are occasionally installed to prevent the conductor from falling off the rope of the tramway in case a pylon or insulator were to break.

  1. Ads

    related to: overhead crane conductor rails chart images