Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Shoring is a term used in the process of air freight container and pallet (ULD) buildup, e.g. making sure that the cargo placed in containers and on pallets is packed securely and efficiently. Specifically, shoring is done to affix cargo to the ULD and adapt different form factors of cargo items to maximize the use of the available ULD volume.
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel-reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving (see below). [1] [2]
The panels are then shipped to a jobsite and erected on temporary shoring. Subsequently, the deck's top reinforcing steel is placed on top of the precast panels at the site, and concrete is poured over the entire assembly to achieve the final thickness of the deck.
In 1935 W.A. de Vigier designed an adjustable steel prop which revolutionized many aspects of the construction industry including to support slab formwork, wall formwork, trench sheeting and falsework. [3] Materials from which falsework systems are manufactured have also diversified from traditional steel and timber to aluminium components.
The traditional slab formwork technique consists of supports out of lumber or young tree trunks, that support rows of stringers assembled roughly 3 to 6 feet or 1 to 2 metres apart, depending on thickness of slab. Between these stringers, joists are positioned roughly 12 inches (30 cm) apart, upon which boards or plywood are placed. The ...
The guide walls are constructed near the ground surface to outline the desired slurry trench, and to guide the excavation machinery. Excavation is done using a special clamshell-shaped digger or a hydromill trench cutter, suspended from a crane. The excavator digs down to design depth (or bedrock) for the first wall segment.
An incomplete list of possible temporary or permanent geotechnical shoring structures that may be designed and utilised as part of earthworks: Mechanically stabilized earth Earth anchor