Soil contaminated with radioactive elements that leaked from Japan's Fukushima Daiichi nuclear power plant was contained through ground freezing. [1]A project in Boston known as the Big Dig used ground freezing during some of its tunneling, to allow its wide tunnels to be built under or through soil that supported existing infrastructure that would have been difficult or expensive to support ...
In traditional construction contracts (known as design–bid–build contracts) the principal contractor is only engaged when a detailed design is complete. An invitation to tender is published and a number of contractors will price the construction of the design, from which a single winner will be chosen to complete the works. Contractors are ...
ISO Lettering templates, designed for use with technical pens and pencils, and to suit ISO paper sizes, produce lettering characters to an international standard. The stroke thickness is related to the character height (for example, 2.5 mm high characters would have a stroke thickness - pen nib size - of 0.25 mm, 3.5 would use a 0.35 mm pen and ...
The 16 Divisions of construction, as defined by the Construction Specifications Institute (CSI)'s MasterFormat, is the most widely used standard for organizing specifications and other written information for commercial and institutional building projects in the U.S. and Canada.
A trial pit (or test pit) is an excavation of ground in order to study or sample the composition and structure of the subsurface, usually dug during a site investigation, a soil survey or a geological survey. Trial pits are dug before the construction. They are dug to determine the geology and the water table of that site.
Schematic cross section of a pressurized caisson. In geotechnical engineering, a caisson (/ ˈ k eɪ s ən,-s ɒ n /; borrowed from French caisson 'box', from Italian cassone 'large box', an augmentative of cassa) is a watertight retaining structure [1] used, for example, to work on the foundations of a bridge pier, for the construction of a concrete dam, [2] or for the repair of ships.
Tunnel Construction. Tunnels are dug in types of materials varying from soft clay to hard rock. The method of tunnel construction depends on such factors as the ground conditions, the ground water conditions, the length and diameter of the tunnel drive, the depth of the tunnel, the logistics of supporting the tunnel excavation, the final use and shape of the tunnel and appropriate risk management.