Lifting equipment, also known as lifting gear, is a general term for any equipment that can be used to lift and lower loads. [1] Types of lifting equipment include heavy machinery such as the patient lift , overhead cranes , forklifts , jacks , building cradles, and passenger lifts, and can also include smaller accessories such as chains ...
This load represents a force that is much less than that required to make the lifting equipment fail or yield. The WLL is calculated by dividing MBL by a safety factor (SF). An example of this would be a chain that has a MBL of 2000 lbf (8.89 kN) would have a SWL or WLL of 400 lbf (1.78 kN) if a safety factor of 5 (5:1, 5 to 1, or 1/5) is used.
Rigging is the equipment such as wire rope, turnbuckles, clevis, jacks used with cranes and other lifting equipment [1] in material handling and structure relocation. Rigging systems commonly include shackles, master links and slings, and lifting bags in underwater lifting.
The weight of the element can be determined by the calculated volume, and using the specific gravity (normal weight reinforced concrete is approximately 24 kN/m3). Establishing the lifting anchor positions will influence the rigging arrangements used and therefore the static analysis of the rigging should be determined. Particular rigging ...
When the mast is rotated, the connected boom is swung from to the side. The control of the lifting location is done by the manipulation of the top pulley system and the rotation of the mast at the base. The load is lifted by another pulley system connected to the top of the boom. [2] In a medium load lifting, another construction method can be ...
A crane's rated load is its Safe Working Load (SWL) and the design load (DL) is, (p 90) [1] = The dynamic lift factor for offshore cranes in the range 10 kN < SWL ≤ 2500 kN is not less than =.(p 84) [1] Thus for a crane with a SWL of 2000 kN (~200 tonne) its design load is not less than, = = The minimum breaking load (MBL) for the combined capacity of reeves of a steel wire hoisting rope ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...