The alignment is the route of the road, defined as a series of horizontal tangents and curves. The profile is the vertical aspect of the road, including crest and sag curves, and the straight grade lines connecting them. The cross section shows the position and number of vehicle and bicycle lanes and sidewalks, along with their cross slope or ...
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
Typical earthworks include road construction, railway beds, causeways, dams, levees, canals, and berms. Other common earthworks are land grading to reconfigure the topography of a site, or to stabilize slopes. Geofoam is a new lightweight earthworks technique used to build a bridge overpass on weak soil near Montreal.
Grade is usually expressed as a percentage - converted to the angle α by taking the inverse tangent of the standard mathematical slope, which is rise / run or the grade / 100. If one looks at red numbers on the chart specifying grade, one can see the quirkiness of using the grade to specify slope; the numbers go from 0 for flat, to 100% at 45 ...
Highway engineering (also known as roadway engineering and street engineering) is a professional engineering discipline branching from the civil engineering subdiscipline of transportation engineering that involves the planning, design, construction, operation, and maintenance of roads, highways, streets, bridges, and tunnels to ensure safe and effective transportation of people and goods.
Typically on straight road sections, the drainage gradient is at least 1–3% due to the normal cross slope of 1–3%. In curved sections the drainage gradient is higher, and may often reach 5–12% due to superelevated CS that may reach 5–8% in areas with icy roads and up to 12% in areas without icy roads.
When a depression must be filled to come up to the road grade the native bed is compacted after the topsoil has been removed. The fill is made by the "compacted layer method" where a layer of fill is spread then compacted to specifications, under saturated conditions. The process is repeated until the desired grade is reached. [40]: 68–69
Pavement sloping: On straight sections of the highway, the roadway is to have a cross slope of at least 1.5%, and preferably 2% to ensure proper drainage, with up to 2.5% in areas of heavy rainfall. The cross slope of both the left and right shoulders should be between 2% and 6%, but not less than the main lanes.