enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Lift slab construction - Wikipedia

    en.wikipedia.org/wiki/Lift_slab_construction

    Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...

  3. Concrete slab - Wikipedia

    en.wikipedia.org/wiki/Concrete_slab

    For a ground-bearing slab, the formwork may consist only of side walls pushed into the ground. For a suspended slab, the formwork is shaped like a tray, often supported by a temporary scaffold until the concrete sets. The formwork is commonly built from wooden planks and boards, plastic, or steel.

  4. Waffle slab - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab

    In situ: Formwork construction and pouring of concrete occur on site, then the slab is assembled (if required). [4] Precast: The slabs are made somewhere else and then brought to the site and assembled. [4] Pre-fabricated: The reinforcements are integrated into the slab while being manufactured, without needing to reinforce the assembly on site ...

  5. Falsework - Wikipedia

    en.wikipedia.org/wiki/Falsework

    Falsework includes temporary support structures for formwork used to mold concrete [1] in the construction of buildings, bridges, and elevated roadways. The British Standards of practice for falsework, BS 5975:2008, defines falsework as "Any temporary structure used to support a permanent structure while it is not self-supporting."

  6. Waffle slab foundation - Wikipedia

    en.wikipedia.org/wiki/Waffle_slab_foundation

    Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.

  7. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    This formwork is assembled on site, usually out of insulating concrete forms (ICF). The formwork stays in place after the concrete has cured, and may provide advantages in terms of speed, strength, superior thermal and acoustic insulation, space to run utilities within the EPS layer, and integrated furring strip for cladding finishes.

  8. Cast-in-place concrete - Wikipedia

    en.wikipedia.org/wiki/Cast-in-place_concrete

    Animation depicting construction of multi-story building using aluminum handset formwork. Steel and plywood formwork for poured in place concrete foundation. Cast-in-place concrete or Cast-in-situ concrete is a technology of construction of buildings where walls and slabs of the buildings are cast at the site in formwork. [1]

  9. Slip forming - Wikipedia

    en.wikipedia.org/wiki/Slip_forming

    The first residential building of slipform construction; erected in 1950 in Västertorp, Sweden, by AB Bygging Later picture of the residential building in Västertorp. Slip forming, continuous poured, continuously formed, or slipform construction is a construction method in which concrete is placed into a form that may be in continuous motion horizontally, or incrementally raised vertically.