It is not known exactly to what extent dams in Ethiopia would reduce the flow of water to Sudan and Ethiopia. Assuming an evaporation rate of 1 meter per year, an irrigated area of 200,000 hectares and a combined reservoir area of 1,000 km2, the flow of the Nile could be reduced by 3 billion cubic meters per year, equivalent to about 5 percent ...
Once completed, the hydroelectric dam will be the second-largest dam in Ethiopia after the Grand Ethiopian Renaissance Dam (GERD) generate up to 6,460 Giga watt-hours (GWh) of electricity, while counterbalancing approximately one million tonnes (Mt) of CO 2 annually. [1] [6] It has 201 meters height and 1012 meters length. On 28 September 2023 ...
Zenawi argued, based on an unnamed study, that the dam would not reduce water availability downstream and would also regulate water for irrigation. [22] In May 2011, it was announced that Ethiopia would share blueprints for the dam with Egypt so that the downstream impact could be examined. [23]
Ethiopia sees the dam as essential to its development but downstream Egypt — the Arab world’s most populous country — fears it will restrict its share of the Nile water, critical for its ...
The water reservoir measures 110 metres (361 ft) in height and is 456 metres (1,496 ft) long. The dam reservoir has a retention capacity of 3,200,000 cubic metres (113,006,934 cu ft) of water. The underground powerhouse has three Francis turbines , each rated at 84.7 megawatts, relaying the power to an above-ground switchyard. [ 5 ]
The Beles Hydroelectric Power Plant, sometimes referred to as Beles II or Tana Beles, is a run-of-the-river [1] hydroelectric power plant in Ethiopia near Lake Tana.The power plant receives water from the lake through the Tana-Beles interbasin transfer and after utilizing it to produce electricity, the water is then discharged into the Beles River.
The dam is 1,700 m (5,600 ft) long and 40 m (130 ft) tall. Construction on the dam began in 1988 but work was halted in 1994. In 1995 construction restarted with a new construction firm. The power station was commissioned in 2004. [2] Water from the dam is diverted through a 9.2 km (5.7 mi) long tunnel to an underground power station downstream.
The Gilgel Gibe III Dam is a 250m high roller-compacted concrete dam with an associated hydroelectric power plant on the Omo River in Ethiopia.It is located about 62 km (39 mi) west of Sodo in the Southern Nations, Nationalities, and Peoples' Region.