Search results
Results from the WOW.Com Content Network
In computational geometry and computer science, the minimum-weight triangulation problem is the problem of finding a triangulation of minimal total edge length. [1] That is, an input polygon or the convex hull of an input point set must be subdivided into triangles that meet edge-to-edge and vertex-to-vertex, in such a way as to minimize the ...
A dead weight tester apparatus uses weights to apply pressure to a fluid for checking the accuracy of readings from a pressure gauge. A dead weight tester (DWT) is a calibration standard method that uses a piston cylinder on which a load is placed to make an equilibrium with an applied pressure underneath the piston. Deadweight testers are ...
The LOT determines the pressure and/or fluid weight the test zone below the casing can sustain. The fluid in the well must be circulated clean to ensure it is of a known and consistent density. If mud is used, it must be properly conditioned and gel strengths minimized. The pump used should be a high-pressure, low-volume test, or cementing pump.
BPV – back pressure valve (goes on the end of coiled tubing a drill pipe tool strings to prevent fluid flow in the wrong direction) BQL – B/QL log; BRPLG – bridge plug log; BRT – below rotary table (used as a datum for depths in a well) BS – bend stiffener; BS – bumper sub; BS – booster station
A drill stem test (DST) is a procedure for isolating and testing the pressure, permeability and productive capacity of a geological formation during the drilling of a well. The test is an important measurement of pressure behaviour at the drill stem and is a valuable way of obtaining information on the formation fluid and establishing whether a ...
Hydrostatic testing is the most common method employed for testing pipes and pressure vessels. Using this test helps maintain safety standards and durability of a vessel over time. Newly manufactured pieces are initially qualified using the hydrostatic test. They are then revalidated at regular intervals according to the relevant standard.
For example, if the tool fails at 1,500 ft (460 m) while drilling with a triple rig (able to trip 3 joints of pipe, or about 90 ft (30 m) feet, at a time), then it would generally be faster to pull the tool out of the hole than it would be to rig up wireline and retrieve the tool, especially if the wireline unit must be transported to the rig.
The test will also provide information about the state of the particular well used to collect data. The overall objective is identifying the reservoir's capacity to produce hydrocarbons, such as oil, natural gas and condensate. Data gathered during the test period includes volumetric flow rate and pressure observed in the