Search results
Results from the WOW.Com Content Network
These units (like other cranes) are designed to be temporarily dismantled and transported over the road on flatbed trailers. Draglines used in most civil engineering are of this smaller, crane type. These are used for road construction, port construction, pond and canal dredging, and as pile driving rigs.
When the pile driver is connected to a dragline excavator, it is powered by the excavator's diesel engine. Vibratory pile drivers are often chosen to mitigate noise, as when the construction is near residences or office buildings, or when there is insufficient vertical clearance to permit use of a conventional pile hammer (for example when ...
The normal method for splicing is by driving the leader pile first, driving a steel tube (normally 60–100 cm long, with an internal diameter no smaller than the minimum toe diameter) half its length onto the end of the leader pile. The follower pile is then simply slotted into the other end of the tube and driving continues.
I also feel that the picture of the pile driver is misleading since this really is not what draglines are primarily used for. The video that I linked to gives a good illustration of how draglines operate including the fact that slacking the drag rope allows the bucket to tip forward. I do have pictures with people in them that show the scale ...
The model mathematically represents the pile driving hammer and all its accessories (ram, cap, and cap block), as well as the pile, as a series of lumped masses and springs in a one-dimensional analysis. The soil response for each pile segment is modeled as viscoelastic-plastic. The method was first developed in the 1950s by E.A. Smith of the ...
Main page; Contents; Current events; Random article; About Wikipedia; Contact us
Q dy = ultimate dynamic bearing capacity of driven pile; α = pile driving hammer efficiency; W H = weight of hammer; H = hammer drop; S = inelastic set of piles, in distance pr. hammer blow; S e = elastic set of piles, in distance pr. hammer blow; L = pile length; A = pile end area; E = modulus of elasticity of pile material
In the diagram, these are stands of drill pipe which are 2 or 3 joints of drill pipe connected and stood in the derrick vertically, usually to save time while tripping pipe. Drill string (#25) is an assembled collection of drill pipe, heavy weight drill pipe, drill collars and any of a whole assortment of tools, connected and run into the ...