The project schedule is a calendar that links the tasks to be done with the resources that will do them. It is the core of the project plan used to show the organization how the work will be done, commit people to the project, determine resource needs, and used as a kind of checklist to make sure that every task necessary is performed.
The precedence diagram method (PDM) is a tool for scheduling activities in a project plan. It is a method of constructing a project schedule network diagram that uses boxes, referred to as nodes, to represent activities and connects them with arrows that show the dependencies. It is also called the activity-on-node (AON) method.
Project plan is a formal, approved document used to guide both project execution and project control. The primary uses of the project plan are to document planning assumptions and decisions, facilitate communication among stakeholders, and document approved scope, cost, and schedule baselines. A project plan may be summary or detailed. [7]
Specific names for the linear scheduling method have been adopted, such as: [1] Location-based scheduling (the preferred term in the book) Harmonograms; Line-of-balance; Flowline or flow line; Repetitive scheduling method; Vertical production method; Time-location matrix model; Time space scheduling method; Disturbance scheduling
A resource-leveled schedule may include delays due to resource bottlenecks (i.e., unavailability of a resource at the required time), and may cause a previously shorter path to become the longest or most "resource critical" path while a resource-smoothed schedule avoids impacting the critical path by using only free and total float. [14]
A Gantt chart showing three kinds of schedule dependencies (in red) and percent complete indications. Henry Gantt, inventor of the Gantt chart. A Gantt chart is a bar chart that illustrates a project schedule. [1] It was designed and popularized by Henry Gantt around the years 1910–1915.
Main page; Contents; Current events; Random article; About Wikipedia; Contact us; Donate
A hammock activity (also hammock task) is a schedule or project planning term for a grouping of tasks that "hang" between two end dates it is tied to. [1] [2] [3] [4]A hammock activity can group tasks that are not related in the hierarchical sense of a Work Breakdown Structure, or are not related in a logical sense of a task dependency, where one task must wait for another.