Ad
related to: curing time for concrete slab
Search results
Results from the WOW.Com Content Network
Therefore, when concreting at cold temperature cannot be avoided, it is essential to have a minimum curing time at a temperature sufficiently above the freezing point of the concrete pore water, so that the early strength of concrete is high enough to resist the inner tensile stress caused by water freezing. [5]
Curing is intended to maintain moist conditions at the surface of concrete. It can be done by letting the formworks in place for a longer time, or by applying a hydrophobic thin film of an oily product (curing compound) at the concrete surface (e.g., for large slabs or rafts) to minimize water evaporation. Drying shrinkage
Concrete is a composite material composed of aggregate bonded together with a fluid cement that cures to a solid over time. Concrete is the second-most-used substance in the world after water, [1] and is the most widely used building material. [2] Its usage worldwide, ton for ton, is twice that of steel, wood, plastics, and aluminium combined. [3]
A concrete slab is a common structural element of modern buildings, consisting of a flat, horizontal surface made of cast concrete. Steel- reinforced slabs, typically between 100 and 500 mm thick, are most often used to construct floors and ceilings, while thinner mud slabs may be used for exterior paving ( see below ).
Accelerated curing is any method by which high early age strength is achieved in concrete. These techniques are especially useful in the prefabrication industry, wherein high early age strength enables the removal of the formwork within 24 hours, thereby reducing the cycle time, resulting in cost-saving benefits. [ 1 ]
Mass concrete is defined by American Concrete Institute Committee 207 as "any ... the initial temperature of the concrete at the time of placement and curing program ...
Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
The ultimate strength of concrete is influenced by the water-cementitious ratio (w/cm), the design constituents, and the mixing, placement and curing methods employed.All things being equal, concrete with a lower water-cement (cementitious) ratio makes a stronger concrete than that with a higher ratio. [2]
Ad
related to: curing time for concrete slab