Cost estimation models are mathematical algorithms or parametric equations used to estimate the costs of a product or project. The results of the models are typically necessary to obtain approval to proceed, and are factored into business plans, budgets, and other financial planning and tracking mechanisms.
A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate. A cost ...
Some practitioners of PCM are mostly concerned with the cost of the product up until the point that the customer takes delivery (e.g. manufacturing costs + logistics costs) or the total cost of acquisition. They seek to launch products that meet profit targets at launch rather than reducing the costs of a product after production.
Cost engineering is "the engineering practice devoted to the management of project cost, involving such activities as estimating, cost control, cost forecasting, investment appraisal and risk analysis". [1] "Cost Engineers budget, plan and monitor investment projects. They seek the optimum balance between cost, quality and time requirements." [2]
Target costing is defined as "a disciplined process for determining and achieving a full-stream cost at which a proposed product with specified functionality, performance, and quality must be produced in order to generate the desired profitability at the product’s anticipated selling price over a specified period of time in the future."
Overall costs of capital projects are known to be subject to economies of scale. A crude estimate is that if the capital cost for a given sized piece of equipment is known, changing the size will change the capital cost by the 0.6 power of the capacity ratio (the point six to the power rule). [16] [d]
Formal estimation model: The quantification step is based on mechanical processes, e.g., the use of a formula derived from historical data. Combination-based estimation: The quantification step is based on a judgmental and mechanical combination of estimates from different sources. Below are examples of estimation approaches within each category.
Bias is a property of the estimator, not of the estimate. Often, people refer to a "biased estimate" or an "unbiased estimate", but they really are talking about an "estimate from a biased estimator", or an "estimate from an unbiased estimator". Also, people often confuse the "error" of a single estimate with the "bias" of an estimator.