The thermodynamic cycle of the basic combined cycle consists of two power plant cycles. One is the Joule or Brayton cycle which is a gas turbine cycle and the other is the Rankine cycle which is a steam turbine cycle. [5] The cycle 1-2-3-4-1 which is the gas turbine power plant cycle is the topping cycle. It depicts the heat and work transfer ...
A heat recovery steam generator (HRSG) is an energy recovery heat exchanger that recovers heat from a hot gas stream, such as a combustion turbine or other waste gas stream. It produces steam that can be used in a process (cogeneration) or used to drive a steam turbine (combined cycle).
The gas-generator cycle, also called open cycle, is one of the most commonly used power cycles in bipropellant liquid rocket engines. Propellant is burned in a gas generator (or "preburner") and the resulting hot gas is used to power the propellant pumps before being exhausted overboard and lost.
Large (land-based) electric powerplants built using this combined cycle can reach conversion efficiencies of over 60%. [ 1 ] If the turbines do not drive a propeller shaft directly and instead a turbo-electric transmission is used, the system is known as COGES (combined gas turbine-electric and steam).
In an electric power system, automatic generation control (AGC) is a system for adjusting the power output of multiple generators at different power plants, in response to changes in the load. Since a power grid requires that generation and load closely balance moment by moment, frequent adjustments to the output of generators are necessary.
Cogeneration plants based on a combined cycle power unit can have thermal efficiencies above 80%. The viability of CHP (sometimes termed utilisation factor), especially in smaller CHP installations, depends on a good baseload of operation, both in terms of an on-site (or near site) electrical demand and heat demand.
Rabigh 2 IPP (R2IPP) is a combined cycle power station project under construction on the western coast of Saudi Arabia, 150 km (93 mi) north of Jeddah. R2IPP will have an installed electrical generating capacity of 2,060 megawatts to supply Makkah Province with electric power .
In an alternating current (AC) electric power system, synchronization is the process of matching the frequency, phase and voltage of a generator or other source to an electrical grid in order to transfer power. If two unconnected segments of a grid are to be connected to each other, they cannot safely exchange AC power until they are synchronized.