Search results
Results from the WOW.Com Content Network
Backcrossing is a crossing of a hybrid with one of its parents or an individual genetically similar to its parent, to achieve offspring with a genetic identity closer to that of the parent. It is used in horticulture, animal breeding, and production of gene knockout organisms.
Rather, bents are simply cross-sectional templates of structural members, i.e., rafters, joists, posts, pilings, etc., that repeat on parallel planes along the length of the structure. The term bent is not restricted to any particular material. Bents may be formed of wooden piles, timber framing, [17] steel framing, or even concrete. [18]
A continuous flow intersection (CFI), also called a crossover displaced left-turn (XDL or DLT), is an alternative design for an at-grade road junction. Vehicles attempting to turn across the opposing direction of traffic (left in right-hand drive jurisdictions; right in left-hand drive jurisdictions) cross before they enter the intersection.
design engineer An engineer whose profession focuses on the engineering design process in any of the various disciplines of engineering, e.g. civil engineering. Design engineers tend to work on products and systems that involve adapting and using complex scientific and mathematical techniques in order to develop solutions for human society.
And of course the tools also include drawing boards (drafting boards) or tables. The English idiom "to go back to the drawing board", which is a figurative phrase meaning to rethink something altogether, was inspired by the literal act of discovering design errors during production and returning to a drawing board to revise the engineering drawing.
Elevation view of the Panthéon, Paris principal façade Floor plans of the Putnam House. A house plan [1] is a set of construction or working drawings (sometimes called blueprints) that define all the construction specifications of a residential house such as the dimensions, materials, layouts, installation methods and techniques.
Step four involves more developed designs and a detailed cost estimate. Step five is the construction documents or the plan. Bidding and contracting for the project follows as step six. Construction then will take place as step seven. The final step, step eight, in the site design process is occupation and management of the site.
The CxP typically is responsible for leading and managing the project commissioning process (design and/or construction) and works closely with the design, construction, and operation teams in a co-operative work environment that focuses on teamwork throughout the building's design, construction, and post construction.