Dhaka Subway is an underground urban rail network being planned in Dhaka, the capital city of Bangladesh, by the Bangladesh Bridge Authority. Dhaka Subway was conceived as a separate transport system to the Dhaka Mass Rapid Transit network, commonly known as Dhaka Metro Rail .
The General Consultant, namely the NKDM Association, commenced work beginning in February 2014. In June 2013, Dhaka Mass Transit Company Limited was established by the government to implement the Metro Rail Lines across the city. [17] Dhaka metro rail was opened by Prime Minister Sheikh Hasina on 29 December 2022. [18]
The MRT Line 4 (Bengali: এমআরটি লাইন ৪) of Dhaka Metro Rail is a proposed mass rapid transit line, stretching from the city's main railway station to the Bandar Upazila. This line is scheduled to be completed by 2030 and will be operated by the Dhaka Mass Transit Company Limited (DMTCL).
The MRT Line 1 (Bengali: এমআরটি লাইন ১) is Dhaka Metro Rail's rapid transit line under construction. It will be the second of the Dhaka Metro Rail system and will be operated by Dhaka Mass Transit Company Limited (DMTCL). Its construction started in February 2023. It is scheduled to open in December 2026. [1]
It will be the third line of the Dhaka Metro Rail system. This line comprises Northern Route and Southern Route . The construction of the MRT Line 5's Northern Route began in 5 November 2023 and is scheduled to commence operation by 2028.
In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka. [ 1 ]
The Dhaka Metro Rail is a mass rapid transit system serving Dhaka, the capital city of Bangladesh. It is owned and operated by the Dhaka Mass Transit Company Limited . [ 1 ] Together with a proposed subway system it is expected to reduce traffic congestion in the city.
The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6. [4] On 11 December 2019, Dhaka Mass Transit Company Limited (DMTCL) signed a loan agreement with the Asian Development Bank (ADB) for pre-construction work of US$33.26 million, which was 74.60% of the required amount. [ 5 ]