Formwork is used in concrete construction as the frame for a structure in which fresh concrete is poured to then harden and take on the desired shape. [6] Aesthetic of concrete surfaces can be varied with different formwork sheathing (e.g. board shuttering, smooth formwork, form liner, form moulds, filter fleeces). The type of material used to ...
For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...
A pile cap is a thick concrete mat that rests on concrete or timber piles that have been driven into soft or unstable ground to provide a suitable stable foundation. It usually forms part of the deep foundation of a building, typically a multi-story building, structure or support base for heavy equipment, or of a bridge.
In-situ evaluation of silane treated concrete cast using Zemdrain formwork liner at Dock street bridge, Belfast. Internal report to Du pont De Nemours, Luxembourg, Report No - TAS 139, June, 1992, p. 8, (Unpublished). Reddi, S.A. Permeable formwork for impermeable concrete. Indian Concrete Journal, January, 1992, pp. 31–35.
A precast concrete walled house under construction An example of low-quality precast concrete with exposed dowels, connectors, indications of cracks, and malformations, even during its installation, Barangay Lantic, Carmona, Cavite, Philippines Interior view of the walls, supports, and roof of a precast commercial shop in Williston, North Dakota, US.
Carpentry is a skilled trade and a craft in which the primary work performed is the cutting, shaping and installation of building materials during the construction of buildings, ships, timber bridges, concrete formwork, etc. Carpenters traditionally worked with natural wood and did rougher work such as framing, but today many other materials ...
The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...
For a ground-bearing slab, the formwork may consist only of side walls pushed into the ground. For a suspended slab, the formwork is shaped like a tray, often supported by a temporary scaffold until the concrete sets. The formwork is commonly built from wooden planks and boards, plastic, or steel.