enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Transpennine Route Upgrade - Wikipedia

    en.wikipedia.org/wiki/Transpennine_Route_Upgrade

    [66] [67] [68] Network Rail said that there would be significant disruption over at least a five year period. [69] [70] However, in an order under the Transport and Works Act 1992 (TWAO) published in March 2021, it was said that work on some of the scheme would extend beyond 2029 i.e. into a later Network Rail Control Periods, CP8. [71]

  3. Rail subsidies - Wikipedia

    en.wikipedia.org/wiki/Rail_subsidies

    In 2015, total domestic rail spending by China was $128 billion and was likely to remain at a similar rate for the rest of the country's next Five Year Period (2016-2020). [17] A planned 8,000 kilometres (about 5,000 miles) of track will be added domestically, with a goal of better connecting existing domestic track with other foreign railway ...

  4. railML - Wikipedia

    en.wikipedia.org/wiki/RailML

    Through version 2.4, three sub-schemes are in productive use: timetable for the description of timetables, infrastructure for the (priority topological) description of tracks and signalling equipment and; rolling stock for the description of vehicles. Since railML version 3.1 an additional sub-scheme was introduced due to the demand of the ...

  5. Great Western Main Line upgrade - Wikipedia

    en.wikipedia.org/wiki/Great_Western_Main_Line...

    The Western Rail Access Programme is a scheme under development by the DfT, Network Rail and local authorities near Heathrow Airport to develop a direct rail link to the airport from the west. At present passengers travelling from the west of Airport Junction need to change trains at either Hayes and Harlington or Paddington which are to the ...

  6. Office of Rail and Road - Wikipedia

    en.wikipedia.org/wiki/Office_of_Rail_and_Road

    ORR holds Network Rail to account through the network licence which includes conditions relating to its management of the railway network, information provision and safety obligations. ORR is also responsible for setting Network Rail's outputs and funding requirement for each Control Period, including the access charges paid by train and ...

  7. List of proposed railway electrification routes in Great Britain

    en.wikipedia.org/wiki/List_of_proposed_railway...

    Railway electrification in the UK has been a stop-start or boom-bust cycle since electrification began. The initial boom was under the 1955 modernisation plan. There was a flurry of activity in the 1980s and early 1990s but this came to a halt in the run up to privatisation and then continued in the 2000s, and also the Great Recession intervened.

  8. Network Rail - Wikipedia

    en.wikipedia.org/wiki/Network_Rail

    Network Rail Ltd. was created with the express purpose of taking over Britain's railway infrastructure control; this was achieved via its purchase of Railtrack plc from Railtrack Group plc for £500 million; Railtrack plc was then renamed and reconstituted as Network Rail Infrastructure Limited. [33] The transaction was completed on 3 October 2002.

  9. Financing of the rail industry in Great Britain - Wikipedia

    en.wikipedia.org/wiki/Financing_of_the_rail...

    They spent £2.8 billion on staffing, £0.6 billion on fuel, £1.4 billion on leasing trains, £1.3 billion on infrastructure access charges and £2.8 billion on other expenditure. They also paid out £228 million in dividends, around 1.2% of the total industry expenditure. [2]