  2. Engineering, procurement, and construction - Wikipedia

    en.wikipedia.org/wiki/Engineering,_procurement...

    The EPC contractor coordinates all design, procurement and construction work and ensures that the whole project is completed as required and in time. They may or may not undertake actual site work. EPC companies are often used in large-scale projects, such as power plants, refineries, chemical processing facilities, infrastructure projects, and ...

  3. Construction management - Wikipedia

    en.wikipedia.org/wiki/Construction_management

    Contract documents (CDs): Contract documents are the final drawings and specifications of the construction project. They are used by contractors to determine their bid while builders use them for the construction process. Contract documents can also be called working drawings. [4]

  4. Submittals (construction) - Wikipedia

    en.wikipedia.org/wiki/Submittals_(construction)

    The construction documents, specifically the technical specifications, require the contractor to submit product data, samples, and shop drawings to the architect and engineer for approval. This is one of the first steps that is taken by the contractor after execution of the construction contract and issuance of the "Notice to Proceed".

  5. Project initiation documentation - Wikipedia

    en.wikipedia.org/wiki/Project_Initiation...

    The project initiation documentation is a PRINCE2 [1] term representing the plan of approach in project management. It is assembled from a series of other documents, including the business case, the terms of reference, the communication plan, the risk register, the project tolerances, the project plan, and any specific project controls or inspections as part of a departmental quality plan or ...

  6. Punch list - Wikipedia

    en.wikipedia.org/wiki/Punch_list

    Examples of punch-list items include damaged building components (e.g. repair broken window, replace stained wallboard, repair cracked paving, etc.), or problems with the final installation of building materials or equipment (for example, install light fixture, connect faucet plumbing, install baseboard trim, reinstall peeling carpet, replace ...

  7. Early contractor involvement - Wikipedia

    en.wikipedia.org/wiki/Early_contractor_involvement

    Early contractor involvement (ECI) is a type of construction contract where the principal contractor is engaged at an early stage in a project to offer input into the design phase. It is in contrast to the design–bid–build model where the contractor is only brought onboard at the end of the design phase.

  8. Template (word processing) - Wikipedia

    en.wikipedia.org/wiki/Template_(word_processing)

    The term template, when used in the context of word processing software, refers to a sample document that has already some details in place; those can (that is added/completed, removed or changed, differently from a fill-in-the-blank of the approach as in a form) either by hand or through an automated iterative process, such as with a software assistant.

  9. Construction contract - Wikipedia

    en.wikipedia.org/wiki/Construction_contract

    A construction contract is a mutual or legally binding agreement between two parties based on policies and conditions recorded in document form. The two parties involved are one or more property owners and one or more contractors .