Search results
Results from the WOW.Com Content Network
The diesel-electric Alugoro has a length of 61.2 metres (200 ft 9 in) with a beam of 6.25 metres (20 ft 6 in) and a hull draught of 5.5 metres (18 ft 1 in). She has a peak speed of 11 knots (20 km/h) when submerged and 21.5 knots (39.8 km/h) surfaced.
All the Indonesia Navy (Indonesian: Tentara Nasional Indonesia-Angkatan Laut, TNI-AL) vessels are named with the prefix KRI (Kapal Perang Republik Indonesia or Naval Vessel of the Republic of Indonesia). Smaller sized boats with light armaments usually have the prefix KAL (Kapal Angkatan Laut or Naval Vessel of the Indonesian Navy). The classes ...
Pari 849 Palindo Marine: 29 April 2013 5 September 2013 Tarakan: Active [4]: Sembilang 850 29 April 2013 5 September 2013 Pontianak: Active [4]: Sidat 851 Citra Shipyard
The vessel, part of the KCR-60m family of fast attack missile craft, has a length of 60 metres (200 ft) and a beam of 8.1 m. At full charge, it has a draft of 2.5 to 2.6 m, and the ship's displacement is 500 tonnes.
Sultan Iskandar Muda was laid down on 8 May 2006 and launched on 24 November 2007 by Damen Group, Vlissingen.She was commissioned on 18 October 2008.. The ship, along with Sultan Hasanuddin, Fatahillah, Malahayati, Sultan Nuku, Raden Eddy Martadinata, I Gusti Ngurah Rai, Abdul Halim Perdanakusuma, Karel Satsuitubun, dr. Wahidin Sudirohusodo, Surabaya, Teluk Banten, Tarakan and Bima Suci were ...
The Indonesian Sea and Coast Guard Unit (Indonesian: Kesatuan Penjagaan Laut dan Pantai Republik Indonesia – KPLP) is an agency of Government of Indonesia which main function is to ensure the safety of shipping inside the Indonesian Maritime Zone. KPLP has the task of formulating and execute policies, standards, norms, guidelines, criteria ...
Belichick has zero experience persuading teenagers to come play for a 72-year-old man, and he’ll play catchup in a sport paced by ace recruiters like Smart, Sarkisian and Oregon’s Dan Lanning.
Indonesia signed a US$150 million contract in December 2004 [2] and the first two units were built in Busan, South Korea.The remaining two were built at Indonesia's PT PAL shipyard in Surabaya with assistance from Daesun.The contract for the 3rd and 4th LPD to be built in Indonesia was signed with PT PAL on March 28, 2005.