enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Insulating concrete form - Wikipedia

    en.wikipedia.org/wiki/Insulating_concrete_form

    The first expanded polystyrene ICF Wall forms were developed in the late 1960s with the expiration of the original patent and the advent of modern foam plastics by BASF. [citation needed] Canadian contractor Werner Gregori filed the first patent for a foam concrete form in 1966 with a block "measuring 16 inches high by 48 inches long with a tongue-and-groove interlock, metal ties, and a waffle ...

  3. Anchor channel - Wikipedia

    en.wikipedia.org/wiki/Anchor_channel

    Anchor channels, invented by Anders Jordahl in 1913, are steel channels cast flush in reinforced concrete elements to allow the installation of channel bolts for the fastening of components. Anchor channels consist of steel C-shaped channels and anchors (mostly headed studs ) which are connected to the channel by welding or riveting/forging.

  4. Precast concrete - Wikipedia

    en.wikipedia.org/wiki/Precast_concrete

    A precast concrete walled house under construction An example of low-quality precast concrete with exposed dowels, connectors, indications of cracks, and malformations, even during its installation, Barangay Lantic, Carmona, Cavite, Philippines Interior view of the walls, supports, and roof of a precast commercial shop in Williston, North Dakota, US.

  5. Box girder - Wikipedia

    en.wikipedia.org/wiki/Box_girder

    The old Britannia Bridge with train track inside the box-girder tunnel Section of the original tubular Britannia Bridge The patent curved and tapered box girder jib of a Fairbairn steam crane. A box girder or tubular girder (or box beam) is a girder that forms an enclosed tube with multiple walls, as opposed to an Ɪ-or H-beam.

  6. Formwork - Wikipedia

    en.wikipedia.org/wiki/Formwork

    For removable forms, once the concrete has been poured into formwork and has set (or cured), the formwork is struck or stripped to expose the finished concrete. The time between pouring and stripping depends on the job specifications, which include the cure required, and whether the form is supporting any weight; it is usually at least 24 hours ...

  7. Residents full of questions for Home Depot - AOL

    www.aol.com/residents-full-questions-home-depot...

    Nov. 4—Moscow residents pressed Home Depot officials on matters like traffic, jobs and water use during a community meeting Friday in Moscow. In August, the Idaho State Board of Education ...

  8. Cold-formed steel - Wikipedia

    en.wikipedia.org/wiki/Cold-formed_steel

    Cold-formed steel framing (CFSF) refers specifically to members in light-frame building construction that are made entirely of sheet steel, formed to various shapes at ambient temperatures. The most common shape for CFSF members is a lipped channel, although "Z", "C", tubular, "hat" and other shapes and variations have been used.

  9. Trench drain - Wikipedia

    en.wikipedia.org/wiki/Trench_drain

    Building a wooden mold that will ultimately form the channel for the trench drain; Attaching a set of metal frames to the top edge of the form (which will hold the trench grating); Suspending the form inside the trough (and flush with the surface elevation), such that there is space (6 inches (150 mm) or more) below and to each side of the form;