Search results
Results from the WOW.Com Content Network
Other Neorion products included a variety of machinery (some of it exported), engine parts, and specialized metal constructions for the Greek industry. In 1997, Neorion acquired another shipyard, Elefsis Shipyards, while it diversified into new fields such as the construction of luxury mega-yachts and subcontracting work for aerospace companies ...
The Goulandris-class were a series of two coastal patrol boats built by the Neorion shipyard and donated to the Hellenic Navy in 1975 and 1977 respectively. [1] They were 40-ton, 24-metre boats, powered by two 1350 hp diesel engines, and armed with a 20 mm gun.
Elefsis Shipyards is a Greek shipbuilding company, also involved in other industrial constructions. Founded in 1968, it has constructed many types of ships, including the largest bulk carriers built in Greece, as well as military ships.
NEL LINES (Greek: Ναυτιλιακή Εταιρία Λέσβου, Naftiliaki Eteria Lesvou) was established in 1972, as a company of popular base with shareholders the residents of Lesvos island and primary aim the purchase of a liner vessel for the Mitilini-Chios-Piraeus route.
Kedrov was 123 m (403 ft 7 in) long overall, with a beam of 14.2 m (46 ft 7 in) and a draught of 5 m (16 ft 5 in). Displacing 3,180 t (3,130 long tons) standard and 3,670 t (3,610 long tons) full load , the ship's power was provided by two 22,500 shp (16,800 kW) DT59 and two 9,000 shp (6,700 kW) DS71 gas turbines arranged in a COGAG ...
5 406 mm (16 in) anti-submarine torpedo tubes (10 tubes in some ships) export version had 1x3 533 mm (21 in) torpedo tubes The Petya class was the NATO reporting name for a class of light frigates designed in the 1950s and built for the Soviet Navy in the 1960s.
The Good Shepherd Catholic Parish in Visalia serves 14,000 registered families. At a glance St. Charles Borromeo will host Sunday services to replace the 11 masses that were held at the other sites.
Pskov was 123 m (403 ft 7 in) long overall, with a beam of 14.2 m (46 ft 7 in) and a draught of 5 m (16 ft 5 in). Displacing 3,180 t (3,130 long tons) standard and 3,670 t (3,610 long tons) full load , the ship's power were provided by two 22,500 shp (16,800 kW) DT59 and two 9,000 shp (6,700 kW) DS71 gas turbines arranged in a COGAG ...