Search results
Results from the WOW.Com Content Network
In 1999 the British government awarded Lockheed Martin U.K. a contract controlling British census info. In 2002, a 7-year contract for the Centers for Medicare and Medicaid Services (CMS) Consolidated Information Technology Infrastructure Contract (CITIC) program. In 2003 a 7-year, $465,000,000 contract to provide services for the CDC.
The two companies previously joined for the program in 2008, but the partnership ended in 2010 when requirements shifted. Boeing believes that as the program had evolved, they can readdress their partnership to specifically address requirements. The team has Boeing's bomber experience and Lockheed Martin's stealth experience.
According to Lockheed Martin and BWXT, there are considerable efficiency and time gains from the nuclear thermal propulsion. [10] [11] NASA believes the much higher efficiency will be two to three times more than chemical propulsion, [5] and the nuclear thermal rocket is to cut the journey time to Mars in half. [12]
Writers of a SOW often include requirements that belong in other parts of a contract. Specifically, quantitative technical requirements are addressed in the military specification and work requirements are specified in the SOW, and data requirements (e.g., delivery, format, and content) should be in the CDRL along with the appropriate DID to minimize the potential for conflict.
For the fiscal year 2020, Lockheed Martin reported earnings of $6.833 billion, with an annual revenue of $65.398 billion, an increase of 9.3% over the previous year. [102] Backlog was 144.0 billion at the end of 2019, up from 130.5 billion at the end of the 2018. Firm orders were $94.5 billion at the end of 2019. [103]
The Navy was forced to halt the contract in response to a challenge by Lockheed. [9] Lockheed officially withdrew their protest in January 2014, [10] allowing the Navy to lift the stop work order. [11] In March 2022, Raytheon announced a $3.2B contract to outfit every new surface ship in the US Navy with the SPY-6 family of radars. [12] [13]
Corporate Audit Directorates (CAD) are located in Lowell, Massachusetts (Raytheon, General Dynamics); McLean, Virginia (Northrop Grumman); Hazelwood, Missouri (Boeing); and Fort Worth, Texas (Lockheed Martin and BAE). Each CAD directs and administers the DCAA mission at its major defense contractors.
In the summer of 2001, the Jet Propulsion Laboratory (JPL) requested mission concepts and proposals from industry-led teams (Boeing, Lockheed Martin, and TRW). [17] The science requirements included at least 500 grams (18 oz) of samples, rover mobility to obtain samples at least 1 kilometre (0.62 mi) from the landing spot, and drilling to obtain one sample from a depth of 2 metres (6 ft 7 in).