enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. BS 5930 - Wikipedia

    en.wikipedia.org/wiki/BS_5930

    Excavations, boreholes probing and geophysical surveying are used to investigate the ground. Intrusive investigations should be sited, spaced and backfilled with care. The GI should give sufficient information to make good decisions on design, construction material selection. The condition and accessibility on site may affect the equipment used.

  3. Eurocode 7: Geotechnical design - Wikipedia

    en.wikipedia.org/.../Eurocode_7:_Geotechnical_design

    EN 1997-2 is intended to be used in conjunction with EN 1997-1 and provides rules supplementary to EN 1997-1 related to planning and reporting of ground investigations, general requirements for a range of commonly used laboratory and field tests, interpretation and evaluation of test results and derivation of values of geotechnical parameters and coefficients.

  4. Standard penetration test - Wikipedia

    en.wikipedia.org/wiki/Standard_penetration_test

    A borehole shall be advanced incrementally to permit intermittent or continuous sampling. Intervals are typically 1.5 m (5 ft) or less in homogeneous strata. Tests and sampling should be done at every change in strata. After the borehole has been advanced to a desired depth and excess cuttings have been removed, testing and sampling can be ...

  5. Borehole - Wikipedia

    en.wikipedia.org/wiki/Borehole

    A borehole is a narrow shaft bored in the ground, either vertically or horizontally. A borehole may be constructed for many different purposes, including the extraction of water ( drilled water well and tube well ), other liquids (such as petroleum ), or gases (such as natural gas ).

  6. Borehole mining - Wikipedia

    en.wikipedia.org/wiki/Borehole_mining

    Borehole Mining (BHM) is a remote operated method of extraction (mining) of mineral resources through boreholes based on in-situ conversion of ores into a mobile form (slurry) by means of high pressure water jetting (hydraulicking). This process is carried-out from a land surface, open pit floor, underground mine or floating vessel through pre ...

  7. Nested wells - Wikipedia

    en.wikipedia.org/wiki/Nested_wells

    Nested wells, also referred to as nested monitoring wells, are composed of multiple tubes or pipes, typically terminating with short screened intervals (2–3 ft), installed in single boreholes. Sand packs must be installed at the screen depths and seals in the borehole are constructed between the sand packs.

  8. Bottom hole assembly - Wikipedia

    en.wikipedia.org/wiki/Bottom_hole_assembly

    The BHA design is based upon the requirements of having enough weight transfer to the bit (WOB) to be able to drill and achieve a sufficient Rate of Penetration (ROP), giving the Driller or Directional Driller directional control to drill as per the planned trajectory and to also include whatever Logging While Drilling (LWD) / Measurement While ...

  9. Offshore geotechnical engineering - Wikipedia

    en.wikipedia.org/wiki/Offshore_geotechnical...

    It is concerned with foundation design, construction, maintenance and decommissioning for human-made structures in the sea. [1] Oil platforms, artificial islands and submarine pipelines are examples of such structures. The seabed has to be able to withstand the weight of these structures and the applied loads. Geohazards must also be taken into ...