Search results
Results from the WOW.Com Content Network
Secondary oil well control is done after the Primary oil well control has failed to prevent formation fluids from entering the wellbore. This process uses "blow out preventer", a BOP, to prevent the escape of wellbore fluids from the well. As the rams and choke of the BOP remain closed, a pressure built up test is carried out and a kill mud ...
Well intervention vessel Skandi Constructor. A well intervention, or well work, is any operation carried out on an oil or gas well during, or at the end of, its productive life that alters the state of the well or well geometry, provides well diagnostics, or manages the production of the well.
the drilling and operating companies well control policies. For workover or completion operations, other methods are often used. Bullheading is a common way to kill a well during workovers and completions operations but is not often used while drilling. Reverse circulation is another kill method used for workovers that are not used for drilling ...
A blowout preventer (BOP) (pronounced B-O-P) [1] is a specialized valve or similar mechanical device, used to seal, control and monitor oil and gas wells to prevent blowouts, the uncontrolled release of crude oil or natural gas from a well. They are usually installed in stacks of other valves.
The valve at the top is called the swab valve and lies in the path used for well interventions like wireline and coiled tubing. For such operations, a lubricator is rigged up onto the top of the tree and the wire or coil is lowered through the lubricator, past the swab valve and into the well. This valve is typically manually operated.
A downhole safety valve refers to a component on an oil and gas well, which acts as a failsafe to prevent the uncontrolled release of reservoir fluids in the event of a worst-case-scenario surface disaster. It is almost always installed as a vital component on the completion.
The tubing may also have flow control mechanism. Single-well concentric kill string: within the well a small diameter concentric kill string is used to circulate kill fluids when needed. Single-well 2-tubing completion: in this instance 2 tubing strings are inserted down 1 well. They are connected at the lower end by a circulating head.
A schematic of a typical oil well being produced by a pumpjack, which is used to produce the remaining recoverable oil after natural pressure is no longer sufficient to raise oil to the surface The production stage is the most important stage of a well's life: when the oil and gas are produced.