The sixth ("fifth serial") Project 22220 icebreaker was initially to be named Kamchatka (Russian: Камчатка; after the Kamchatka Peninsula), [65] but in November 2023 it was announced that they would be instead named Leningrad (Russian: Ленинград) to commemorate the Siege of Leningrad. [66] The keel-laying ceremony of the vessel ...
Keel laying is one of the four specially celebrated events in a ship's life; the others are launching, commissioning, and decommissioning. Earlier, the event recognized as the keel laying was the initial placement of the central timber making up the backbone of a vessel, called the keel. As steel ships replaced wooden ones, the central timber ...
The keel of the sixth Project 22220 icebreaker was laid on 26 January 2024. [3] The vessel was initially to be named Kamchatka (Russian: Камчатка) after the Kamchatka Peninsula, [17] but in November 2023 it was announced that instead it would be named Leningrad (Russian: Ленинград) to commemorate the Siege of Leningrad. [18]
The coin ceremony is an event which takes place at the keel laying, in the early stages of a ship's construction.In it, the shipbuilders place one or two coins under the keel block of the new ship to bless the ship and as a symbol of good fortune.
The keel of the second Project 22220 icebreaker was laid on 26 May 2015. [2] After the launching of Arktika in June and in order to make way for the keel laying of the third icebreaker, [ 24 ] the partially-assembled hull weighing about 3,500 tonnes (3,400 long tons) was moved about 125 metres (410 ft) along the slipway to the position where ...
The ship's keel was laid in Newport News, Virginia on 22 August 2015. [14] As part of the traditional keel laying ceremony, the initials of ship sponsor Caroline Kennedy, daughter of President Kennedy and the sponsor of the previous John F. Kennedy, were welded into the ship's hull. [14] As of late June 2017 the ship was 50% structurally ...
The keel laying ceremony was held on 19 January 2006 [5] and the hull was launched on 28 May 2008. While delivery was initially scheduled for late 2008, [ 6 ] she was officially commissioned on 12 July 2009.
Ural under construction at Baltic Shipyard in July 2019 with another Project 22220 icebreaker in the background. The tender for construction of two additional Project 22220 nuclear-powered icebreakers, referred to as the first and second serial vessels of the project, was announced at the keel laying ceremony of the lead ship Arktika on 5 November 2013. [6]