Big Muskie was the world's largest ever dragline. Built by Bucyrus-Erie in 1969, it was 487 ft (148 m) in length, weighed some 13,500 short tons (12,247 t), and hoisted a 220 cu yd (168.2 m 3) bucket that could move 325 short tons (295 t) of material at a pass.
When the pile driver is connected to a dragline excavator, it is powered by the excavator's diesel engine. Vibratory pile drivers are often chosen to mitigate noise, as when the construction is near residences or office buildings, or when there is insufficient vertical clearance to permit use of a conventional pile hammer (for example when ...
Vibratory pile driver is a machine for driving piles into sandy and clay soils. Press-in pile driver is a machine for sinking piles into the ground by means of static force transmission. [16] Universal drilling machine.
The model mathematically represents the pile driving hammer and all its accessories (ram, cap, and cap block), as well as the pile, as a series of lumped masses and springs in a one-dimensional analysis. The soil response for each pile segment is modeled as viscoelastic-plastic. The method was first developed in the 1950s by E.A. Smith of the ...
Bi-Directional Static Load Test is a steadfast Maintained Load Test option for both large and small diameter piles that is widely used in the market. The main difference between a top-loaded maintained load test and a Bi-Directional is the location of the jack.
Piping and instrumentation diagram of pump with storage tank. Symbols according to EN ISO 10628 and EN 62424. A more complex example of a P&ID. A piping and instrumentation diagram (P&ID) is defined as follows: A diagram which shows the interconnection of process equipment and the instrumentation used to control the process.
Q dy = ultimate dynamic bearing capacity of driven pile; α = pile driving hammer efficiency; W H = weight of hammer; H = hammer drop; S = inelastic set of piles, in distance pr. hammer blow; S e = elastic set of piles, in distance pr. hammer blow; L = pile length; A = pile end area; E = modulus of elasticity of pile material
Dynamic load testing (or dynamic loading) is a method to assess a pile's bearing capacity by applying a dynamic load to the pile head (a falling mass) while recording acceleration and strain on the pile head. Dynamic load testing is a high strain dynamic test which can be applied after pile installation for concrete piles. For steel or timber ...