Lift slab construction (also called the Youtz-Slick Method) is a method of constructing concrete buildings by casting the floor or roof slab on top of the previous slab and then raising (jacking) the slab up with hydraulic jacks. This method of construction allows for a large portion of the work to be completed at ground level, negating the ...
Waffle slab foundations adhere to International Building Code requirements. By 2008, most states put into effect the changes adopted in the 2006 IBC and, in regards to foundations, the on-grade mat foundation has become a more attractive design because, as an engineered system, it already accommodates the 2008 design recommendations, and required no major modifications to bring it into compliance.
Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.
An alternative raised floor application with disposable formworks from job site in Turkey A suction-cup tile lifter has been used to remove a tile.. A raised floor (also raised flooring, access floor(ing), or raised-access computer floor) provides an elevated structural floor above a solid substrate (often a concrete slab) to create a hidden void for the passage of mechanical and electrical ...
For a suspended slab, there are a number of designs to improve the strength-to-weight ratio. In all cases the top surface remains flat, and the underside is modulated: A corrugated slab is designed when the concrete is poured into a corrugated steel tray, more commonly called decking. This steel tray improves strength of the slab, and prevents ...
The ground floor with a slab on grade has less temperature rise compared to middle and top floors, and an increase of the supply air temperature causes a decrease in the temperature rise. The temperature rise is not significantly affected by the perimeter zone orientation, the internal heat gain and the window-to-wall ratio. [16]
This reduces the labor cost and time typically required to grind and patch the soffits of cast-in-place concrete decks to achieve an acceptable aesthetic finish. The method of deck construction can be applied anywhere conventionally poured-in-place concrete is specified, such as flat plate, beam and slab, and wall-bearing structures.
However, their voids are placed on the underside of the slab rather than embedded within the slab, leading to lower shear strength and fire resistance. [7] There has been a range of proprietary implementations of voided biaxial slabs, including the use of polystyrene blocks as a filler material in the voids. [ 6 ]