Search results
Results from the WOW.Com Content Network
The HTR-PM is a high-temperature gas-cooled (HTGR) pebble-bed reactor. While the German AVR and THTR-300, operating from 1969 to 1988, were the first pebble-bed reactors and operated at similar temperatures, the HTR-PM is the first such design using modular construction and the second small modular reactor, following Russia's Akademik Lomonosov floating plant in 2019.
Sketch of a pebble-bed reactor. The pebble-bed reactor (PBR) is a design for a graphite-moderated, gas-cooled nuclear reactor. It is a type of very-high-temperature reactor (VHTR), one of the six classes of nuclear reactors in the Generation IV initiative. Graphite pebble for reactor. The basic design features spherical fuel elements called ...
A high-temperature gas-cooled reactor (HTGR) is a type of gas-cooled nuclear reactor which uses uranium fuel and graphite moderation to produce very high reactor core output temperatures. [1] All existing HTGR reactors use helium coolant. The reactor core can be either a "prismatic block" (reminiscent of a conventional reactor core) or a ...
Category: Pebble bed reactors. ... Download as PDF; Printable version; In other projects ... HTR-10; HTR-PM; P. Pebble bed modular reactor; T. THTR-300
China was the first country to operate a demonstration generation-IV reactor, the HTR-PM in Shidaowan, Shandong, [7] [8] which is a pebble-bed type high-temperature gas-cooled reactor. It was connected to the grid in December 2023, making it the world's first Gen IV reactor to enter commercial operation.
The HTR-PM is a high-temperature gas-cooled (HTGR) pebble-bed generation IV reactor partly based on the earlier HTR-10 prototype reactor. [70] The reactor unit has a thermal capacity of 250 MW, and two reactors are connected to a single steam turbine to generate 210 MW of electricity. [70]
HTR-10 is a pebble-bed high-temperature gas reactor utilizing spherical fuel elements with ceramic coated fuel particles. The reactor core has a diameter of 1.8 metres (5 ft 11 in), a mean height of 1.97 metres (6 ft 6 in) and the volume of 5.0 cubic metres (180 cu ft), and is surrounded by graphite reflectors .
Reactor two achieved first criticality in November 2021. [14] Reactor one was connected to the state power grid and began producing power in December 2021 [15] The HTR-PM project demonstrated it had reached "initial full power" in December 2022. [16] The HTR-PM project finally entered commercial operation in December 2023. [17]