Search results
Results from the WOW.Com Content Network
Feedwater pumps range in size up to many kilowatts and the electric motor is usually separated from the pump body by some form of mechanical coupling. Large industrial condensate pumps may also serve as the feedwater pump. In either case, to force the water into the boiler, the pump must generate sufficient pressure to overcome the steam ...
Small pumps have tanks that range from 2 to 4 liters (0.5 to 1 gallon) and are usually supported using the flanges on their tanks or simply placed upon the floor. A plastic impeller in a molded volute at the bottom of the pump provides the pumping action; this impeller is connected to the motor via a metal shaft that extends downwards from the ...
Gree Electric is a majority state-owned enterprise, primarily by the city of Zhuhai. [9] As of 31 December 2015, the largest shareholder of Gree Electric was Gree Group; it was followed by Hebei Jinghai Investment Guarantee (for 8.91%), China Securities Finance (for 2.99%), Central Huijin Investment (for 1.40%).
These motors are sometimes called DC motors, sometimes EC motors and occasionally DC/EC motors. DC stands for direct current and EC stands for electronically commutated.. DC motors allow the speed of the fans within a fan coil unit to be controlled by means of a 0-10 Volt input control signal to the motor/s, the transformers and speed switches associated with AC fan coils are not required.
The condensate expelled from a condensing boiler is acidic, with a pH between 3 and 4. Condensing boilers require a drainpipe for the condensate produced during operation. This consists of a short length of polymer pipe with a vapour trap to prevent exhaust gases from being expelled into the building.
At the bottom of the shell, where the condensate collects, an outlet is installed. In some designs, a sump (often referred to as the hotwell) is provided. Condensate is pumped from the outlet or the hotwell for reuse as boiler feedwater. For most water-cooled surface condensers, the shell is under [partial] vacuum during normal operating ...
The condensate drips down and collects at the bottom, often in a built-in pan called a hotwell. The shell side often operates at a vacuum or partial vacuum, produced by the difference in specific volume between the steam and condensate. Conversely, the vapor can be fed through the tubes with the coolant water or air flowing around the outside.
At $1 per therm, the cost of the gas would be about 40 cents. In comparison, a typical 230 L (60 US gal) tank electric water heater has a 4.5 kW (15,000 BTU/h) heating element, which at 100% efficient results in a heating time of about 2.34 hours. At $0.16/kWh the electricity would cost $1.68.