Search results
Results from the WOW.Com Content Network
A USBR soil scientist advances a Giddings Probe direct push soil sampler.. Geotechnical investigations are performed by geotechnical engineers or engineering geologists to obtain information on the physical properties of soil earthworks and foundations for proposed structures and for repair of distress to earthworks and structures caused by subsurface conditions; this type of investigation is ...
After the borehole has been advanced to a desired depth and excess cuttings have been removed, testing and sampling can be conducted. The test uses a thick-walled sampling tube, with an outside diameter of 5.01 cm (2 in) and an inside diameter of 3.5 cm (1.375 in), and a length of at least 60 cm (24 in).
A water resources borehole into the chalk aquifer under the North Downs, England at Albury. Engineers and environmental consultants use the term borehole to collectively describe all of the various types of holes drilled as part of a geotechnical investigation or environmental site assessment (a so-called Phase II ESA).
This is used to attempt to ensure that tests, boreholes, and piles, do not encounter unexploded ordnance (UXO) or duds. The magnetometer in the cone detects ferrous materials of 50 kg or larger within a radius of up to about 2 m distance from the probe depending on the material, orientation and soil conditions.
Geotechnical surveys involve a combination of sampling, drilling, in situ testing as well as laboratory soil testing that is conducted offshore and, with samples, onshore. They serve to ground truth the results of the geophysical investigations; they also provide a detailed account of the seabed stratigraphy and soil engineering properties. [23]
Well logging, also known as borehole logging is the practice of making a detailed record (a well log) of the geologic formations penetrated by a borehole.The log may be based either on visual inspection of samples brought to the surface (geological logs) or on physical measurements made by instruments lowered into the hole (geophysical logs).
A trial pit (or test pit) is an excavation of ground in order to study or sample the composition and structure of the subsurface, usually dug during a site investigation, a soil survey or a geological survey. Trial pits are dug before the construction. They are dug to determine the geology and the water table of that site.
Rock quality designation (RQD) has several definitions. The most widely used definition was developed in 1964 by D. U. Deere. It is the borehole core recovery percentage incorporating only pieces of solid core that are longer than 100 mm in length measured along the centerline of the core.