Search results
Results from the WOW.Com Content Network
On September 4 at 6:54 p.m. CDT the failed blowout preventer reached the surface of the water and at 9:16 p.m. CDT it was placed in a special container on board the vessel Helix Q4000. [15] The failed blowout preventer was taken to a NASA facility in Louisiana for examination [15] by Det Norske Veritas (DNV).
Casing head (#27) is a large metal flange welded or screwed onto the top of the conductor pipe (also known as drive-pipe) or the casing and is used to bolt the surface equipment such as the blowout preventers (for well drilling) or the Christmas tree (oil well) (for well production).
Cameron ram-type blowout preventer. The Cameron ram-type blowout preventer was the first successful blowout preventer (BOP) for oil wells. It was developed by James S. Abercrombie and Harry S. Cameron in 1922. [1] [2] The device was issued U.S. patent 1,569,247 on January 12, 1926. [3] The blowout preventer was designated as a Mechanical ...
Failure of blowout preventer equipment was a major cause of the April 2010 disaster that killed 11 workers and resulted in an estimated 130 million gallons of crude oil spewing into the Gulf of ...
BP (BP) said Friday that the Deepwater Horizon rig's blowout preventer, which failed to prevent oil from the Macondo well from flowing into the Gulf of Mexico, has been removed from atop the well.
Abercrombie was born the fourth of 13 children in Huntsville, Texas to parents James Buford and Evelina Abercrombie Jr on 7 July, 1891. He attended a grammar school in his hometown throughout childhood, before eventually his family was forced to move in 1900, citing a combination of the harsh winters in the area, as well as an infestation of ...
[1] While drilling the oil well, surface pressure control is provided by a blowout preventer (BOP). If the pressure is not contained during drilling operations by the column of drilling fluid , casings, wellhead, and BOP, a well blowout could occur.
8) The blowout preventer failed in several ways; controls on the rig were disabled by the explosion; an automatic shutoff system within the blowout preventer failed, probably due to failure of two components - a solenoid and battery; when a submersible was able to activate a blind shear within the blowout preventer, the blind shear functioned ...