Getlink, formerly Groupe Eurotunnel, is a European public company based in Paris that manages and operates the infrastructure of the Channel Tunnel between France and the United Kingdom, operates the LeShuttle railway service, and earns revenue on other trains that operate through the tunnel (Eurostar passenger and DB Schenker freight).
The Channel Tunnel (French: Tunnel sous la Manche), sometimes referred to informally as the Chunnel, [3] [4] is a 50.46 km (31.35-mile) undersea railway tunnel, opened in 1994, that connects Folkestone (Kent, England) with Coquelles (Pas-de-Calais, France) beneath the English Channel at the Strait of Dover.
Similar proposals had made in the past but were never realised. The Anglo-French Treaty on the Channel Tunnel was signed by both governments in Canterbury Cathedral. The treaty prepared the concession for the construction and operation of the "fixed link" by privately owned companies.
In October 1986 Eurotunnel was partially floated and the contractors and banks no longer exercised control over the company. Beginning in 1987 relations between TML and Eurotunnel deteriorated, with significant and increasingly public rows erupting over cost and programme management. With the completion of the Channel Tunnel TML ceased to exist.
A tunnel could be built between Sweden and Åland, about 50 km (30 mi) long, and 100–200 m (330–660 ft) deep, with the lowest depth around Märket, a little detour. The area between Åland and Finland is shallow with many islands, able to be connected with bridges - some of which already exist.
The Eurotunnel Folkestone Terminal is a railway terminal built for the transport of road-going vehicles on specially constructed trains through the Channel Tunnel. The station is located in Cheriton, a northern suburb of the town of Folkestone in the county of Kent. It is the terminal for the United Kingdom.
LeShuttle [1] (formerly Eurotunnel Le Shuttle and also known as The Shuttle) is a railway shuttle service between Calais in France and Folkestone in the United Kingdom. It conveys road vehicles (including cars, bicycles and motorcycles) and passengers (including some animals) by rail through the Channel Tunnel .
In 1988, the CTSA's chairman informed Eurotunnel that a more systematic approach to risk analysis was necessary. [4] Despite the lack of completion of studies into the tunnel's vulnerability to severe earthquakes , by 1993, the authority was prepared to permit the tunnel to be declared complete.