The planned capacity of the power plant is 1980 MW (3x660 MW). The project was originally proposed in 1999 but got delayed because Coal India Limited objected to the location of the power plant and wanted NTPC to relocate the power plant as it was coming up on site having 6 billion tonnes of coal underneath it.
NTPC Limited is constructing the 3 X 660 MW North Karanpura Thermal Power Station at Tandwa at an appraised current (2015) estimated cost of ₹ 14,366.58 crore (143,665,800,000). [7] Efforts are on to get the first unit of the North Karanpura Thermal Power Station ready in 2021. [8] [needs update]
The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants. It is the largest power company in India with an installed capacity of 76442.78 MW. [5] Although the company has approximately 16% of the total national capacity ...
Pages in category "Coal-fired power stations in Jharkhand" The following 12 pages are in this category, out of 12 total. This list may not reflect recent changes .
Bokaro Thermal Power Station B (BTPS - B) is located at Bokaro district in Jharkhand, 44 km from the Bokaro Steel City and 55 km from Dhanbad city. The nearest railway station is Bokaro Thermal. The power plant is one of the coal-based power plants of DVC.
Patratu Super Thermal Power Project is under-construction. It is 4000 MW (800 MW × 5), situated in Patratu , Ramgarh district , Jharkhand . It will use 1500 acres out of 6300 acres available with the existing Patratu Thermal Power Station .
It has two chimneys made by a Russian firm, which are called the Russian side. The other two chimneys were made by an Indian firm, so it is called the Indian side. The plant has a power generation capacity of 840MW. [14] [15] Construction of 4000 MW power plant is going on in Patratu, the first unit will start in the year 2024. [16]
The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India.