Search results
Results from the WOW.Com Content Network
The satellite designs also required that the Space Shuttle have a 4.6 by 18 m (15 by 60 ft) payload bay. NASA evaluated the F-1 and J-2 engines from the Saturn rockets , and determined that they were insufficient for the requirements of the Space Shuttle; in July 1971, it issued a contract to Rocketdyne to begin development on the RS-25 engine.
STS-66 was a Space Shuttle program mission that was flown by the Space Shuttle Atlantis. STS-66 launched on November 3, 1994, at 11:59:43.060 am EDT from Launch Pad 39B at NASA's Kennedy Space Center. Atlantis landed at Edwards Air Force Base on November 14, 1994, at 10:33:45 am EST.
STS-51-F (also known as Spacelab 2) was the 19th flight of NASA's Space Shuttle program and the eighth flight of Space Shuttle Challenger. It launched from Kennedy Space Center , Florida , on July 29, 1985, and landed eight days later on August 6, 1985.
NASA's Long Duration Exposure Facility, or LDEF (pronounced "eldef"), was a cylindrical facility designed to provide long-term experimental data on the outer space environment and its effects on space systems, materials, operations and selected spores' survival. [2] [3] It was placed in low Earth orbit by Space Shuttle Challenger in April
The habitable Spacelab laboratory module comprised a cylindrical environment in the rear of the Space Shuttle orbiter payload bay, connected to the orbiter crew compartment by a tunnel. The laboratory had an outer diameter of 4.12 m (13.5 ft), and each segment a length of 2.7 m (8 ft 10 in).
The collection of Shuttle subsystems and components used to hold and manipulate items in the payload bay, especially items for which flight release (or mating) was planned. Elements included the Shuttle RMS, Payload Retention Latch Assemblies, Grapple Fixtures, Targets, and a CCTV system. See the Payload Bay User's Guide (NASA/NSTS, 2011).
Primary mission objectives were deployment of the Laser Geodynamics Satellite 2 (LAGEOS-2) and operation of the U.S. Microgravity Payload-1 (USMP-1). LAGEOS 2, a joint effort between NASA and the Italian Space Agency (ASI), was deployed on day 2 and boosted into an initial elliptical orbit by ASI's Italian Research Interim Stage (IRIS).
The payload for the mission was moved to Launch Pad 39A on the October 29, 2009, and was installed into the shuttle's payload bay on November 4, 2009. During the post-flight interview on November 16, shuttle launch director Mike Leinbach told that Atlantis officially beat shuttle Discovery on the record low amount of Interim Problem Reports ...