enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Eurocode 5: Design of timber structures - Wikipedia

    en.wikipedia.org/wiki/Eurocode_5:_Design_of...

    EN 1995-1-2 deals with the design of timber structures for the accidental situation of fire exposure and is intended to be used in conjunction with EN 1995-1-1 and EN 1991-1-2:2002. EN 1995-1-2 only identifies differences from, or supplements normal temperature design and deals only with passive methods of fire protection.

  3. Eurocode 7: Geotechnical design - Wikipedia

    en.wikipedia.org/.../Eurocode_7:_Geotechnical_design

    EN 1997-2 is intended to be used in conjunction with EN 1997-1 and provides rules supplementary to EN 1997-1 related to planning and reporting of ground investigations, general requirements for a range of commonly used laboratory and field tests, interpretation and evaluation of test results and derivation of values of geotechnical parameters ...

  4. Drilling - Wikipedia

    en.wikipedia.org/wiki/Drilling

    Wood being softer than most metals, drilling in wood is considerably easier and faster than drilling in metal. Cutting fluids are not used or needed. The main issue in drilling wood is ensuring clean entry and exit holes and preventing burning. Avoiding burning is a question of using sharp bits and the appropriate cutting speed.

  5. Standard penetration test - Wikipedia

    en.wikipedia.org/wiki/Standard_penetration_test

    After the borehole has been advanced to a desired depth and excess cuttings have been removed, testing and sampling can be conducted. The test uses a thick-walled sampling tube, with an outside diameter of 5.01 cm (2 in) and an inside diameter of 3.5 cm (1.375 in), and a length of at least 60 cm (24 in).

  6. Silt fence - Wikipedia

    en.wikipedia.org/wiki/Silt_fence

    Silt fence installed on a construction site. Silt fences are often installed as perimeter controls. They are typically used in combination with sediment basins and sediment traps, as well as with erosion controls, which are designed to retain sediment in place where soil is being disturbed by construction processes (i.e., land grading and other earthworks).

  7. Piling - Wikipedia

    en.wikipedia.org/wiki/Bored_pile

    Also called caissons, drilled shafts, drilled piers, cast-in-drilled-hole piles (CIDH piles) or cast-in-situ piles, a borehole is drilled into the ground, then concrete (and often some sort of reinforcing) is placed into the borehole to form the pile. Rotary boring techniques allow larger diameter piles than any other piling method and permit ...

  8. Deep hole drilling - Wikipedia

    en.wikipedia.org/wiki/Deep_hole_drilling

    Due to this design features, a certain amount of the cutting forces during the process is transferred via the guide pads to the bore hole wall. These force components at the tool head are supported at the produced borehole wall and thus guide the tool in the bore hole itself.

  9. Casing (borehole) - Wikipedia

    en.wikipedia.org/wiki/Casing_(borehole)

    Casing Diameters of a Borehole Casing Diagram premium gas tight connections on a casing string. Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream.