enow.com Web Search

  1. Ad

    related to: 4 leg sling load calculation worksheet for industrial use

Search results

  1. Results from the WOW.Com Content Network
  2. Cargo hook (helicopter) - Wikipedia

    en.wikipedia.org/wiki/Cargo_hook_(helicopter)

    The load beam is the solid piece of metal at the bottom of a cargo hook that supports the load. Usually it has a curved, narrow end which is used to load a ring, rope, or net onto the hook. The keeper is the locking, spring-operated mechanism that keeps the load from sliding off the load beam during transport.

  3. Rigging (material handling) - Wikipedia

    en.wikipedia.org/wiki/Rigging_(material_handling)

    Sheer legs; Sling (rigging) – Rope, webbing, wire or chain used to support a load for lifting; Rope splicing – Semi-permanent joint between two ropes; Tackle – System of two or more pulleys and a rope or cable; Tirfor – Device for pulling cable; Tugger (rigging) Turnbuckle – Device for adjusting the tension or length of ropes or cables

  4. Derrick - Wikipedia

    en.wikipedia.org/wiki/Derrick

    On the top side, the two legs are connected together by a lashing but with a small spacer block placed between the legs. A sling, which may be made from ropes, is placed around the area that two legs meet to be used to put a tackle pulley system for lifting the load. There are two guy wires, front and rear, to support the shear legs.

  5. File:US Army Air Assault School-Sling Load Training.ogv

    en.wikipedia.org/wiki/File:US_Army_Air_Assault...

    Original file (Ogg multiplexed audio/video file, Theora/Vorbis, length 1 min 2 s, 1,280 × 720 pixels, 4.51 Mbps overall, file size: 33.54 MB) This is a file from the Wikimedia Commons . Information from its description page there is shown below.

  6. Material-handling equipment - Wikipedia

    en.wikipedia.org/wiki/Material-handling_equipment

    Manipulators act as “muscle multipliers” by counterbalancing the weight of a load so that an operator lifts only a small portion (1%) of the load's weight, and they fill the gap between hoists and industrial robots: they can be used for a wider range of positioning tasks than hoists and are more flexible than industrial robots due to their ...

  7. Manual handling of loads - Wikipedia

    en.wikipedia.org/wiki/Manual_handling_of_loads

    Legs; Using the score of each body part posture in group A, locate the score in table A to assign a group A posture score. This score is then added to the muscle use score and the force/load score which assigns the wrist and arm Score. Using the score of each body part posture in group B, locate the score in table B to assign a group B posture ...

  8. Lifting equipment - Wikipedia

    en.wikipedia.org/wiki/Lifting_equipment

    Lifting equipment can be assigned a Working Load Limit (WLL) in the interests of avoiding failure; Working Load Limit is calculated by dividing the Minimum Breaking Load of the equipment by a safety factor. [5] WLL as a concept is not restricted to lifting, being also relevant for mooring ropes. [6]

  9. Hoist (device) - Wikipedia

    en.wikipedia.org/wiki/Hoist_(device)

    Hoist atop an elevator. A hoist is a device used for lifting or lowering a load by means of a drum or lift-wheel around which rope or chain wraps. It may be manually operated, electrically or pneumatically driven and may use chain, fiber or wire rope as its lifting medium.

  1. Ad

    related to: 4 leg sling load calculation worksheet for industrial use