Feroze Gandhi Unchahar Thermal Power Plant has an installed capacity of 1,550 megawatts (2,080,000 hp), inclusive of Fourth Stage, that got operational in April 2017. The First unit was commissioned in November 1988. The coal for the plant is derived from North Karanpura Coalfield. The water source is from Sarda Sahyak Canal. [3]
The power plant is under construction with power capacity of 1600 MW (2x800 MW) in first phase and in total planned capacity of 4000 MW. [2] It is the coal based power plant of National Thermal Power Corporation. It is being built near Ramagundam city in Peddapalli District. [3] The first Unit, 800MW, was inaugurated by PM Modi on 3 October 2023.
The company intends to add 10000 MW of Solar PV capacity in the next five years. On 18 July 2015, NTPC declared commercial its first Hydro Power plant at Koldam in the state of Himachal Pradesh. The company has a long-term plan to reduce its fossil fuel capacity mix to 56% by 2032. NTPC also plans to go global.
Khargone Super Thermal Power Station is a coal-based thermal power project, located at village Selda and Dalchi in Khargone district in the Indian state of Madhya Pradesh. [1]
The power plant is one of the coal based power plants of NTPC Limited. [2] Coal will be obtained from Dulanga and Pakri Barwadih Coal Block and water supply will be sourced from the Hirakund Reservoir on the Mahanadi River through a pipeline at over a distance of about 30.0 km from project site.
The power station has a planned capacity of 1320 MW (2x660 MW). [4] The first unit of Solapur Super Thermal power station was commissioned and declared commercial on 25 September 2017. [ 5 ]
Its planned capacity is 3200 MW (4x800 MW). The land for the project is already acquired and the foundation stone for the project was laid in February 2014. [3] NTPC Limited awarded the EPC contract to BHEL for this project. [4] The first unit was synchronized with grid on 30.08.2018 at 05.12 AM IST.
Capacity Date of Commissioning First: 1: 200: January, 1986 First: 2: 200: ... Specifications on NTPC website This page was last edited on 5 December 2024, at 18:45 ...