Typically in the form of a horizontal wire or rod, or a helical anchor, a tieback is commonly used along with other retaining systems (e.g. soldier piles, sheet piles, secant and tangent walls) to provide additional stability to cantilevered retaining walls. [1]
A soldier pile wall using reclaimed railway sleepers as lagging. Soldier piles, also known as king piles or Berlin walls, are constructed of steel H sections spaced about 2 to 3 m apart and are driven or drilled prior to excavation. As the excavation proceeds, horizontal timber sheeting (lagging) is inserted behind the H pile flanges.
One of at least 29 experimental piles that were constructed in 1942 under the West Stands of Stagg Field. Each tested elements incorporated into the final design. The pile was built in September 1941 from 4-by-4-by-12-inch (10 by 10 by 30 cm) graphite blocks and tinplate iron cans of uranium oxide. The cans were 8-by-8-by-8-inch (20 by 20 by 20 ...
Screw piles are typically manufactured from high-strength steel [1] using varying sizes of tubular hollow sections with helical flights. The pile shaft transfers a structure's load into the pile. Helical steel plates are welded to the pile shaft to suit the site specific ground conditions. Helices can be press-formed to a specified pitch or ...
The Danish pile-driving formula is a formula which enables one to have a good gauge of the bearing capacity of a driven pile. History The formula was constructed by ...
Shoring is commonly used when installing the foundation of a building. A shoring system such as piles and lagging or shotcrete will support the surrounding loads until the underground levels of the building are constructed. Commonly used shoring equipment includes post shores, shoring beams, and timber jacks.
It differs from the statnamic load test and dynamic load testing in that the pressure applied to the pile is slower. [1] [2] Static load testings are performed in order to measure a design's axial tension or axial compression. It can also be used to measure its deflected shape under lateral load.
The design parameters for the piles can be independently chosen from the Tripod itself and reflect the geotechnical needs explicitly. There is no need to apply scour protection. The connection to the pile is usually achieved using a grouted connection. This is a technique where special concrete is poured in the joint gap between pile and pile ...