Search results
Results from the WOW.Com Content Network
Not all historians are convinced that the P.1000 even got as far as an outline design. Although it is generally accepted that Hitler asked for a feasibility study into a 1000-ton tank in 1942, there is much doubt around the specifics of the plan to use the 280-millimetre (11 in) guns or spare turrets from the battleship Gneisenau. The turrets ...
An oil tanker's inert gas system is one of the most important parts of its design. [18] Fuel oil itself is very difficult to ignite, however its hydrocarbon vapors are explosive when mixed with air in certain concentrations. [19] The purpose of the system is to create an atmosphere inside tanks in which the hydrocarbon oil vapors cannot burn. [18]
An oil tanker's inert gas system is one of the most important parts of its design. [91] Fuel oil itself is very difficult to ignite, but its hydrocarbon vapors are explosive when mixed with air in certain concentrations. [92] The purpose of the system is to create an atmosphere inside tanks in which the hydrocarbon oil vapors cannot burn. [91]
Oil well control is the management of the ... units of pounds force per square inch of area, or psi. 1000 psi equals ... the surface tanks that constitute the primary ...
The Landkreuzer P.1000 was a super-heavy tank designed by Edward Grote for Nazi Germany in 1942. If completed, the P.1000 would have been 35 meters (115 feet) long and 14 meters (46 feet) wide, with a weight of ranging from 800 to 1,000 tons depending on the variant.
The Inch pipelines comprised two systems, the Big Inch pipeline and the Little Big Inch pipeline. [22] The Big Inch was a 24-inch (610 mm) pipeline for crude oil; it ran from the East Texas Oil Field at Longview, Texas, to Norris City, Illinois, and on to Phoenixville, Pennsylvania, from where it branched into 20-inch-diameter (510 mm) segments ...
Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!
From 1984 Helder A received oil production from the Kotter production platform by 27.4 km 12-inch diameter pipeline. [5] To increase production, in 1991 Unocal drilled 5 horizontal wells and horizontal laterals from 9 of the existing wells in the Helder field.