Search results
Results from the WOW.Com Content Network
The progenitor of the BWR line was the 5 MW Vallecitos Boiling Water Reactor (VBWR), brought online in October 1957. Six design iterations, BWR-1 through BWR-6, were introduced between 1955 and 1972. This was followed by the Advanced Boiling Water Reactor (ABWR) introduced in the 1990s and the Economic Simplified Boiling Water Reactor (ESBWR ...
The BWRX-300 is a smaller evolution of an earlier GE Hitachi reactor design, note the Economic Simplified Boiling Water Reactor (ESBWR) design and utilizing components of the operational Advanced boiling water reactor (ABWR) reactor. [1] Boiling water reactors are nuclear technology that use ordinary light water as a nuclear reactor coolant ...
The Economic Simplified Boiling Water Reactor (ESBWR) is a passively safe generation III+ reactor design derived from its predecessor, the Simplified Boiling Water Reactor (SBWR) and from the Advanced Boiling Water Reactor (ABWR). All are designs by GE Hitachi Nuclear Energy (GEH), and are based on previous Boiling Water Reactor designs.
Construction cost: $2.490 billion (2007 USD) [1] Owner: Duke Energy: Operator: Duke Energy: Nuclear power station ; Reactor type: BWR: Reactor supplier: General Electric: Cooling source: Cape Fear River: Thermal capacity: 2 × 2923 MW th: Power generation; Units operational: 1 × 938 MW 1 × 920 MW: Make and model: BWR-4 (Mark 1) Nameplate ...
Construction cost: Unit 1: $423 million (2010 USD) or $577 million in 2023 dollars [1] Unit 2: $856 million (2010 USD) or $1.17 billion in 2023 dollars [1] Unit 3: $828 million (2010 USD) or $1.13 billion in 2023 dollars [1] Owner: Constellation Energy: Operator: Constellation Energy: Nuclear power station ; Reactor type: BWR: Reactor supplier ...
The increased cost related to operation and maintenance of a BWR tends to balance the savings due to the simpler design and greater thermal efficiency of a BWR when compared with a PWR. Most of the radioactivity in the water is very short-lived (mostly N-16, with a 7-second half-life ), so the turbine hall can be entered soon after the reactor ...
The advanced boiling water reactor (ABWR) is a Generation III boiling water reactor. The ABWR is currently offered by GE Hitachi Nuclear Energy (GEH) and Toshiba . The ABWR generates electrical power by using steam to power a turbine connected to a generator; the steam is boiled from water using heat generated by fission reactions within ...
Due to inflation and cost overruns, Clinton's final construction cost was $4.25 billion ($11.4 billion today), nearly 1,000% over the original budget of $430 million and seven years behind schedule. [1] The station has a single generation II General Electric Boiling Water Reactor. The present reactor operating license was issued April 17, 1987 ...