Search results
Results from the WOW.Com Content Network
Settlement is the downward movement or the sinking of a structure's foundation. It is mostly caused by changes in the underlying soil, such as drying and shrinking, wetting and softening, or compression due to the soil being poorly compacted when construction started. [1] Some settlement is quite normal after construction has been completed.
FHA construction loans: For as little as 3.5 percent down, you can get a construction loan insured by the Federal Housing Administration (FHA). These come in the form of a construction-to ...
Down payment: 3.5 percent with a credit score of at least 580, or at least 10 percent with a credit score between 500 and 579. Loan limits: ... VA or USDA construction loans: ...
Later investigations, however, have suggested that foundations with a depth, measured from the ground surface, equal to 3 to 4 times their width may be defined as shallow foundations. [ 4 ] Terzaghi developed a method for determining bearing capacity for the general shear failure case in 1943.
Shallow foundation construction example. A shallow foundation is a type of building foundation that transfers structural load to the Earth very near to the surface, rather than to a subsurface layer or a range of depths, as does a deep foundation. Customarily, a shallow foundation is considered as such when the width of the entire foundation is ...
Foundation with pipe fixtures coming through the sleeves. In engineering, a foundation is the element of a structure which connects it to the ground or more rarely, water (as with floating structures), transferring loads from the structure to the ground. Foundations are generally considered either shallow or deep. [1]
The most common project finance construction contract is the engineering, procurement and construction (EPC) contract. An EPC contract generally provides for the obligation of the contractor to build and deliver the project facilities on a fixed price, turnkey basis, i.e., at a certain pre-determined fixed price, by a certain date, in ...
Multiple Advance, Closed End: This type of loan (typically a construction loan) advances incremental amounts up to a certain limit, based upon some criteria such as inspection and approval of a draw request. Any principal reductions received during the loan period are not available to be drawn on, but rather have paid down the loan balance.