The most current soil survey data is made available for high end GIS users such as professional consulting companies and universities. Typical information in a published county soil survey includes the following: [1] a brief overview on how to use the survey; a general soil map for comparing the sustainability of large sections of the county
The cone penetration or cone penetrometer test (CPT) is a method used to determine the geotechnical engineering properties of soils and delineating soil stratigraphy. It was initially developed in the 1950s at the Dutch Laboratory for Soil Mechanics in Delft to investigate soft soils.
A soil test is a laboratory or in-situ analysis to determine the chemical, physical or biological characteristics of a soil. Possibly the most widely conducted soil tests are those performed to estimate the plant-available concentrations of nutrients in order to provide fertilizer recommendations in agriculture.
Soil resistivity, measured in ohm-centimeters (Ω⋅cm), varies with moisture content and temperature changes. In general, an increase in soil moisture results in a reduction in soil resistivity. The pore fluid provides the only electrical path in sands, while both the pore fluid and the surface charged particles provide electrical paths in clays.
The AASHTO Soil Classification System was developed by the American Association of State Highway and Transportation Officials, and is used as a guide for the classification of soils and soil-aggregate mixtures for highway construction purposes.
To collect soil samples, gather soil from 10 to 12 spots in a yard or garden. For lawns, dig three inches deep; for gardens, at least eight inches. Combine the samples in a container, break apart ...
The original Proctor test, ASTM D698 / AASHTO T99, uses a 4-inch-diameter (100 mm) by 4.584-inch-high (116.4 mm) mold which holds 1/30 cubic feet of soil, and calls for compaction of three separate lifts of soil using 25 blows by a 5.5 lb hammer falling 12 inches, for a compactive effort of 12,375 ft-lbf/ft 3.
Step four involves more developed designs and a detailed cost estimate. Step five is the construction documents or the plan. Bidding and contracting for the project follows as step six. Construction then will take place as step seven. The final step, step eight, in the site design process is occupation and management of the site.