enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Dwang - Wikipedia

    en.wikipedia.org/wiki/Dwang

    Joist bridging, or blocking, is used between floor or ceiling joists, but this is to prevent the joists from (twisting or rotating under load) rather than to prevent buckling in compression. Herringbone strutting may replace blocking with smaller, timber battens fixed diagonally, in pairs, between joists.

  3. Joist - Wikipedia

    en.wikipedia.org/wiki/Joist

    A double floor is a floor framed with joists supported by larger timbers.. In traditional timber framing there may be a single set of joists which carry both a floor and ceiling called a single floor (single joist floor, single framed floor) or two sets of joists, one carrying the floor and another carrying the ceiling called a double floor (double framed floor).

  4. Lath and plaster - Wikipedia

    en.wikipedia.org/wiki/Lath_and_plaster

    It consists of narrow strips of wood which are nailed horizontally across the wall studs or ceiling joists and then coated in plaster. The technique derives from an earlier, more primitive process called wattle and daub. [1] Lath and plaster largely fell out of favour in the U.K. after the introduction of plasterboard in the 1930s. [2]

  5. American historic carpentry - Wikipedia

    en.wikipedia.org/wiki/American_historic_carpentry

    The joists are eliminated by the use of heavy planks saving time and strength of the timbers because the joists notches were eliminated. The beams are spaced 4 feet (1.2 m) to 18 feet (5.5 m) apart and the planks are 2 inches (5.1 cm) or more thick possibly with another layer of 1 inch (2.5 cm) on the top as the finished flooring could span ...

  6. I-joist - Wikipedia

    en.wikipedia.org/wiki/I-joist

    A similar situation occurs where the I-joist crosses a main beam. Installing squash blocks (2×4 materials 1 ⁄ 16 in or 1.6 mm higher than the I-joist) alongside the I-joists transfers the load from the I-joist onto the beam. Missed nails and glue setting too fast can lead to an uneven or squeaky floor. [3]

  7. Domestic roof construction - Wikipedia

    en.wikipedia.org/wiki/Domestic_roof_construction

    In the UK, a concrete tiled roof would normally have rafters at 600 mm (24 in) centers, roof battens at 300 mm (12 in) centers and ceiling joists at 400 mm (16 in) centers. The United States still uses imperial units of measurement and framing members are typically spaced sixteen or twenty-four inches apart.

  8. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  9. Trimmer (construction) - Wikipedia

    en.wikipedia.org/wiki/Trimmer_(construction)

    In light-frame construction, a trimmer is a timber or metal beam (joist) used to create an opening around a stairwell, skylight, chimney, and the like. Trimmers are installed parallel to the primary floor or ceiling joists and support headers, which run perpendicular to the primary joists.