Search results
Results from the WOW.Com Content Network
A movable scaffolding system (MSS) is a special-purpose self-launching form used in bridge construction, specifically prestressed concrete bridges with segments or spans that are cast in place. The movable scaffolding system is used to support a form while the concrete is cured; once the segment is complete, the scaffold and forms are moved to ...
A steelyard balance, steelyard, or stilyard is a straight-beam balance with arms of unequal length. It incorporates a counterweight which slides along the longer arm to counterbalance the load and indicate its weight. A steelyard is also known as a Roman steelyard or Roman balance. A 19th-century steelyard crane
Stringer: Steel beam that ties caps together Top cap: Steel Beam Post: steel pipe or 12×12 lumber. Bottom cap: steel beam Wedge pack: 4×4 lumber cut into wedges for falsework adjustment, various lumber sizes include 2×6s and plywood Corbel: distribute load to pads. Typical material is 12×12 lumber and steel beams Pad: distribute load to ground.
The parts of triple beam balance are identified as the following. [3]Weighing pan - The area in which an object is placed in order to be weighed.; Base - The base rests underneath the weighing pan and can usually be customized to fit on a workbench or set up with tripod legs.
The balance (also balance scale, beam balance and laboratory balance) was the first mass measuring instrument invented. [1] In its traditional form, it consists of a pivoted horizontal lever with arms of equal length – the beam or tron – and a weighing pan [10] suspended from each arm (hence the plural name "scales " for a weighing instrument).
Like other structural elements, a cantilever can be formed as a beam, plate, truss, or slab. When subjected to a structural load at its far, unsupported end, the cantilever carries the load to the support where it applies a shear stress and a bending moment. [1] Cantilever construction allows overhanging structures without additional support.
When the mast is rotated, the connected boom is swung from to the side. The control of the lifting location is done by the manipulation of the top pulley system and the rotation of the mast at the base. The load is lifted by another pulley system connected to the top of the boom. [2] In a medium load lifting, another construction method can be ...
Deck penetrations on offshore platform provided to avoid water/chemical dripping to lower deck in case of spillage. Acts as toe guard. For wall penetrations it can be a type of strengthening. Together with packing it helps to protect from fire spread from one room to other.