Construction management (CM) aims to control the quality of a project's scope, time, and cost (sometimes referred to as a project management triangle or "triple constraints") to maximize the project owner's satisfaction.
[1] They are used by a construction manager who is working as an agent to the owner or by the owner itself to carry-out a construction project while mitigating the risks to the scope of work, time, budget, quality and safety of the project. These risks ranges from cost overruns, time delays and conflict among the various parties.
Time and materials (T&M) is a standard phrase in a contract for construction, product development, or any other piece of work in which the employer agrees to pay the contractor based upon the time spent by the contractor's employees and the subcontractors' employees to perform the work, and for materials used in the construction, plus the contractor's markup on the materials used, no matter ...
In project management, resource leveling is defined by A Guide to the Project Management Body of Knowledge (PMBOK Guide) as "A technique in which start and finish dates are adjusted based on resource limitation with the goal of balancing demand for resources with the available supply."
The Construction (Design and Management) Regulations 2007, [1] also known as CDM Regulations or CDM 2007, previously defined legal duties for the safe operation of UK construction sites. They were superseded by the Construction (Design and Management) Regulations 2015 .
However, if there is a reason to speed project delivery, Fast-track can be used with any project delivery strategy, such as CM at Risk and Agency CM (see Construction management), design–build, bridging and integrated project delivery. Even the traditional design–bid–build process can use Fast-track concepts by bidding separate general ...
Design–bid–build (or design/bid/build, and abbreviated D–B–B or D/B/B accordingly), also known as Design–tender (or "design/tender"), traditional method, or hardbid, is a project delivery method in which the agency or owner contracts with separate entities for the design and construction of a project.
The EPC contractor coordinates all design, procurement and construction work and ensures that the whole project is completed as required and in time. They may or may not undertake actual site work. EPC companies are often used in large-scale projects, such as power plants, refineries, chemical processing facilities, infrastructure projects, and ...