enow.com Web Search

Search results

  1. Results from the WOW.Com Content Network
  2. Minimum drainage gradient - Wikipedia

    en.wikipedia.org/wiki/Drainage_gradient

    Most road design manuals require drainage gradient to exceed 0.5%, in order to drain water and prevent excessive skid accidents. [1]One exception to the minimum 0.5% DG limit can be found in the Norwegian road design manual, where the minimum drainage gradient is 2% instead of 0.5%.

  3. Roof pitch - Wikipedia

    en.wikipedia.org/wiki/Roof_pitch

    Display of roof pitches 1:12 through 18:12 A roof made of thatch, one of the oldest roofing materials, needs a steep pitch to drain properly Some types of stone roof have a very restrictive roof pitch, which can lead to leaking Working on roofs with pitches too steep for safety requires a staging of scaffolding boards secured with roof brackets A pitch gauge measuring the slope of an asphalt ...

  4. Geometric design of roads - Wikipedia

    en.wikipedia.org/wiki/Geometric_design_of_roads

    Steeper cants or cambers are common on residential streets, allowing water to drain into the gutter. Cross slope describes the slope of a roadway perpendicular to the centerline. If a road were completely level, water would drain off it very slowly. This would create problems with hydroplaning, and ice accumulation in cold weather.

  5. Grading (earthworks) - Wikipedia

    en.wikipedia.org/wiki/Grading_(earthworks)

    Section through railway track and foundation showing the sub-grade. Grading in civil engineering and landscape architectural construction is the work of ensuring a level base, or one with a specified slope, [1] for a construction work such as a foundation, the base course for a road or a railway, or landscape and garden improvements, or surface drainage.

  6. Cross slope - Wikipedia

    en.wikipedia.org/wiki/Cross_slope

    Cross slope, cross fall or camber is a geometric feature of pavement surfaces: the transverse slope with respect to the horizon. It is a very important safety factor. Cross slope is provided to provide a drainage gradient so that water will run off the surface to a drainage system such as a street gutter or ditch.

  7. Grade (slope) - Wikipedia

    en.wikipedia.org/wiki/Grade_(slope)

    l = slope length α = angle of inclination. The grade (US) or gradient (UK) (also called stepth, slope, incline, mainfall, pitch or rise) of a physical feature, landform or constructed line is either the elevation angle of that surface to the horizontal or its tangent. It is a special case of the slope, where zero indicates horizontality. A ...

  8. 3 tips for fantasy football playoff success [Video] - AOL

    www.aol.com/sports/3-tips-fantasy-football...

    Subscribe to Yahoo Fantasy Forecast on Apple Podcasts, Spotify, YouTube or wherever you listen.. 1. 🧐 Don’t give a second of thought to matching up your lineup with your opponent’s. Please ...

  9. Interstate Highway standards - Wikipedia

    en.wikipedia.org/wiki/Interstate_Highway_standards

    Pavement sloping: On straight sections of the highway, the roadway is to have a cross slope of at least 1.5%, and preferably 2% to ensure proper drainage, with up to 2.5% in areas of heavy rainfall. The cross slope of both the left and right shoulders should be between 2% and 6%, but not less than the main lanes.