Search results
Results from the WOW.Com Content Network
A hydraulic tappet, also known as a hydraulic valve lifter or hydraulic lash adjuster, is a device for maintaining zero valve clearance in an internal combustion engine. Conventional solid valve lifters require regular adjusting to maintain a small clearance between the valve and its rocker or cam follower .
A tappet or valve lifter is a valve train component which converts rotational motion into linear motion in activating a valve. It is most commonly found in internal combustion engines , where it converts the rotational motion of the camshaft into linear motion of intake and exhaust valves, either directly or indirectly.
The tieback-deadman structure resists forces that would otherwise cause the wall to lean, as for example, when a seawall is pushed seaward by water trapped on the landward side after a heavy rain. Tiebacks are drilled into soil using a small diameter shaft, and usually installed at an angle of 15 to 45 degrees.
Fixes that fail is a system archetype that in system dynamics is used to describe and analyze a situation, where a fix effective in the short-term creates side effects for the long-term behaviour of the system and may result in the need of even more fixes. [1] This archetype may be also known as fixes that backfire [2] or corrective actions ...
Simpler camshaft drive system: OHV engines have a less complex drive system for the camshaft than OHC engines. [16] Most OHC engines drive the camshaft or camshafts using a timing belt, a chain, or multiple chains. These systems require the use of tensioners, which add complexity. In contrast, an OHV engine has the camshaft positioned close to ...
The rocker ratio is the distance travelled by the valve divided by the distance travelled by the pushrod effective. The ratio is determined by the ratio of the distances from the rocker arm's pivot point to the point where it touches the valve and the point where it touches the pushrod/camshaft.
Where the depth of bedrock is too great to for a box cut to be economically viable, or the bedrock is not strong enough, civil engineering techniques such as diaphragm walls or concrete piles may be used to create a deep foundation instead. Pre-Sink. The pre-sink is the excavation and support of the first 60 – 100 metres of the shaft barrel ...
A 2.5-ton screw jack. The jack is inserting the bar (visible lower left) in the holes at the top and turning.. A jackscrew, or screw jack, is a type of jack that is operated by turning a leadscrew.