enow.com Web Search

  1. Ad

    related to: how test alternator with multimeter manual diagram free print

Search results

  1. Results from the WOW.Com Content Network
  2. Growler (electrical device) - Wikipedia

    en.wikipedia.org/wiki/Growler_(electrical_device)

    to test series and interpoles (commutating) fields from a DC motor; to determine phasing and polarity in multiwinding armatures; to test rotors in rotating frequency changers, as well as in wound rotors; to test shorts between turns in taped coils before installation into an armature or a stator; as a low voltage isolation transformer

  3. Continuity test - Wikipedia

    en.wikipedia.org/wiki/Continuity_test

    In electronics, a continuity test is the checking of an electric circuit to see if current flows (that it is in fact a complete circuit). A continuity test is performed by placing a small voltage (wired in series with an LED or noise-producing component such as a piezoelectric speaker ) across the chosen path.

  4. Open-circuit test - Wikipedia

    en.wikipedia.org/wiki/Open-circuit_test

    Circuit diagram for open-circuit test. The open-circuit test, or no-load test, is one of the methods used in electrical engineering to determine the no-load impedance in the excitation branch of a transformer. The no load is represented by the open circuit, which is represented on the right side of the figure as the "hole" or incomplete part of ...

  5. Multimeter - Wikipedia

    en.wikipedia.org/wiki/Multimeter

    Any meter will load the circuit under test to some extent. For example, a multimeter using a moving coil movement with full-scale deflection current of 50 microamps (μA), the highest sensitivity commonly available, must draw at least 50 μA from the circuit under test for the meter to reach the top end of its scale. This may load a high ...

  6. Short-circuit test - Wikipedia

    en.wikipedia.org/wiki/Short-circuit_test

    The test is conducted on the high-voltage (HV) side of the transformer where the low-voltage (LV) side (or the secondary) is short-circuited. A wattmeter is connected to the primary side. An ammeter is connected in series with the primary winding. A voltmeter is optional since the applied voltage is the same as the voltmeter reading.

  7. Synchronization (alternating current) - Wikipedia

    en.wikipedia.org/wiki/Synchronization...

    The sequence of events is similar for manual or automatic synchronization. The generator is brought up to approximate synchronous speed by supplying more energy to its shaft - for example, opening the valves on a steam turbine, opening the gates on a hydraulic turbine, or increasing the fuel rack setting on a diesel engine. The field of the ...

  8. AOL Mail

    mail.aol.com

    Get AOL Mail for FREE! Manage your email like never before with travel, photo & document views. Personalize your inbox with themes & tabs. You've Got Mail!

  9. Load bank - Wikipedia

    en.wikipedia.org/wiki/Load_bank

    A load bank is a piece of electrical test equipment used to simulate an electrical load, to test an electric power source without connecting it to its normal operating load. [ 1 ] [ 2 ] During testing, adjustment, calibration, or verification procedures, a load bank is connected to the output of a power source, such as an electric generator ...

  1. Ad

    related to: how test alternator with multimeter manual diagram free print