Search results
Results from the WOW.Com Content Network
The power factor in a single-phase circuit (or balanced three-phase circuit) can be measured with the wattmeter-ammeter-voltmeter method, where the power in watts is divided by the product of measured voltage and current. The power factor of a balanced polyphase circuit is the same as that of any phase. The power factor of an unbalanced ...
In electrical engineering the load factor is defined as the average load divided by the peak load in a specified time period. [1] It is a measure of the utilization rate, or efficiency of electrical energy usage; a high load factor indicates that load is using the electric system more efficiently, whereas consumers or generators that underutilize the electric distribution will have a low load ...
For example, balanced two-phase power can be obtained from a three-phase network by using two specially constructed transformers, with taps at 50% and 86.6% of the primary voltage. This Scott T connection produces a true two-phase system with 90° time difference between the phases.
Another way to avoid the transformer inrush current is a "transformer switching relay". This does not need time for cool down. It can also deal with power-line half-wave voltage dips and is short-circuit-proof. This technique is important for IEC 61000-4-11 tests. Another option, particularly for high-voltage circuits, is to use a pre-charge ...
In the power systems analysis field of electrical engineering, a per-unit system is the expression of system quantities as fractions of a defined base unit quantity. . Calculations are simplified because quantities expressed as per-unit do not change when they are referred from one side of a transformer to t
Solar PV and wind turbines have a capacity factor limited by the availability of their "fuel", sunshine and wind respectively. A hydroelectricity plant may have a capacity factor lower than 100% due to restriction or scarcity of water, or its output may be regulated to match the current power need, conserving its stored water for later usage.
VA ratings are also often used for transformers; maximum output current is then VA rating divided by nominal output voltage. [6] Transformers with the same sized core usually have the same VA rating. The convention of using the volt-ampere to distinguish apparent power from real power is allowed by the SI standard. [7] [page needed]
Current, voltage and power are measured at the primary winding to ascertain the admittance and power-factor angle. Another method of determining the series impedance of a real transformer is the short-circuit test .